Search Building Permits
2,840 permits · HVAC · NY
1) installation of gas furnaces with split system dx coils for heating and cooling. 2) installation of exhaust and erv systems for ventilation.
1) installation of gas furnaces with split system dx coils for heating and cooling. 2) installation of exhaust and erv systems for ventilation.
Replacement of existing air conditioning units to provide cooling for existing duplex dwelling unit. Related ductwork and diffusers. Install electric radiant heat in toilet. No change to use, egress o...
Mechanical modifications to include hvac replacement and replacement of associated ductwork. no change in use, egress or occupancy.
Repair gas lines and proposed ceiling mounted gas furnaces.
Replace existing gas boiler, hot water heater and dryer in the cellar. construct a new three-fixture bathroom in the cellar. replace existing residential stove on first floor and install new plumbing...
Modifications to the existing HVAC system and associated ducts and piping on the 32nd Floor (EQT), as per plans. No change to use, egress, or occupancy.
Jacobi Medical Center proposed Mechanical-HVAC work interior renovation of an MRI on 3rd and 4th Floor. No change in use, egress or occupancy. All as per plans filed herewith.
Modifying ductwork & supply diffuser to accommodate new partition layout, Demolition of existing AC systems & ductwork .Adding air conditioning units to the 2nd floor to supplement the removed systems...
Installation of new hvac systems & ventilations systems along w/ associated ductwork & piping as indicated on the drawings filed herein.
L-4 CARDIOLOGY Phase 4 : HVAC MODIFICATIONS TO ACCOMMODATE THE PHASE 4, CARDIOLOGY, IN THE EXISTING HOSPITAL BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY.
HVAC tenant fit-out including installation and replacement of air conditioning and ventilation equipment, associated ductwork and piping, and related controls within the existing ground-floor tenant s...
Installation of Mechanical HVAC system including heating and cooling equipment, ventilation duct work & fans, and mechanical piping in conjunction with job# B00989327-I1
Installation of new boiler as per plans filed. No change in occupancy, use or egress.
Replacement of brick masonry, replacement of steel lintels, replacement of 3-wythe parapets, replacement of thru wall air conditioner sleeves, and replacement of coping stone. No scope of work at the...
Reach 7 - Temporary relocation of the HVAC system. Once construction of the proposed area is done, HVAC will be restored back to its original location. No change to use, egress or occupancy.
New air conditioning and ventilation installation for apartment renovation in conjunction with GC #M01084668-I1. No change to use, egress, or occupancy. Post Approval Amendment filed to show changes t...
1) installation of gas furnaces with split system dx coils for heating and cooling. 2) installation of exhaust and erv systems for ventilation.
Nycha boilers-
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.