168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Herewith filing for mechanical modifications on the roof as per plans. no change to use occupancy or egress.
Minor repair of (1) commercial unit and (15) dwelling units and common hallway from cellar to roof. no change to use, egress or occupancy.
Existing two-family house with mechanical work at cellar, basement, 1 st, 2nd floor and roof. job filed to related to alt2application # b01301132-i1.2. no change in use, means of e…
Reinforcement of deteriorated existing cinder concrete slabs at the 15th floor and roof via the installation of new under-slab steel support members. localized patching of the unde…
Parapet repairs and alternate roof replacement as shown on the drawings filed herewith. No change in use, egress, or occupancy.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Installation of rear yard deck, removal of masonry chimney, removal of brick piers at rear facade, stair opening on 1st Floor, and rooftop dunnage installation. Foundation & Struct…
Bremond King Davis Cluster: Existing 5-Story Old Law Tenement Building; proposed new replacement of existing windows/roof; and ordinary repair exterior walls, common area, kitchen/…
Replacement of (1) Rooftop Unit
Exterior repairs including Removal and replacement of cracked and/or spalled masonry units and deteriorated joint sealant. Repairs for limestone spall & stucco. Masonry Repointing.…
Installation of 300 psf sidewalk shed and roof protection as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under th…
Herewith filing for mechanical modifications on the roof as per plans. no change to use occupancy or egress.
Exterior repairs to include parapet replacement & waterproofing. no change in use, egress or occupancy.
Install AC units on Roof and Mechanical and Exhaust system & Components throughout. No change to egress, occupancy or use.
General construction for parapet wall replacement at north and south elevations and masonry repairs at roof as per plans filed herewith. no change in use, egress or occupancy.
Installation of new spray booth at the first floor of an existing commercial building. new spray booth will require general construction. addition of new roof top equipment on exis…
Installation of non-emergency gas fired generator with related gas booster pump on existing equipment platform on roof. All work in compliance with TPPN 5/98. No change to occupanc…
Installation of temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application…
Replacment of two rooftop units with a total capacity of 73 tons. no change to egress, use, or occupancy.
AT&T - Removal and relocation of existing equipment cabinets on existing equipment platforms on roof. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
Perform strctural work inconjunction with existing ug6 eating & drinking establishment renovation. replace existing roof joists, columns & girders due fire damage. no change to use…