Search Building Permits
5,472 permits · Roofing · NY
Facade repair, including pointing, brick replacement, caulking, replacement of window lintel & installation of waterproofing and replacement of window sills & lintels. No change in occupancy, use or e...
Modification to existing Verizon site. Replace 6 antennas, remove 3 antennas, install 3 antennas, replace 9 RRH units, remove RRH rack, and install 1 equipment cabinet on an existing platform on the r...
New slab openings and infill. install new elevator core and stair bulkhead. reinforce existing floor framing. work on floors 01-03 & roof. filed in conjunction with alt-co #m00972936.
Northwell LIJ Medical Center - Bone Marrow Transplant (BMT) Project: minor structural scope (installation of roof dunnage framing in support of new mechanical equipment) as per plans filed herewith.
Proposed 1 story rear yard horizontal enlargement and front yard sunroom reconstruction. new roof terrace overenlargement. associated structure and foundation. no change of use, egress or occupancy.
P.S. 95-Q: Addition of refrigerant piping, split system air-cooled heat pump systems, rooftop mounted air source heat pump units, mechanical and natural smoke purge, ductwork, electric heating coils a...
Herewith filing for construction of framed roof bulkhead. filing to repair all damaged surfaces in existing stairwell. filing for installation of 42h metal fence at roof perimeter to address stop work...
Installation of a temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Proposed replacement of the party wall between the existing residental buildings located at54-26 80th street and 54-28 80th street. general constructon works at cellar, ist thru roofas per plan.no cha...
Installation of temporary overhead protection per plan. no change in use, egress, or occupancy. the overhead protection at 110 greenwich st roofs/terrace. and in the courtyard east at 102 &110 & 108 &...
Filing for Facade Repairs work that includes repair of concrete balconies, application of sealants, waterproofing coatings, etc. as shown on drawings filed herewith. No change in use, egress or occupa...
Installation of 300 psf sidewalk shed, ohp, yodocks, fence, pipe scaffolding, window protection and roof protection as per plans. all equipment shall comply with chapter #33 of the 2022 code. no chang...
Local Law 11/98 related facade and roof-bulkhead repair project. No change in use, egress or occupancy.
Installation of pv system on existing roof top. no changes to the use egress or occupancy.
Temporary roof/overhead protection during nb construction at the adjoining property (176 dikeman st), filed sep. temporary roof/overhead protection shall comply with ch #33 of the nyc bc. no change in...
Rooftop Solar Installation. No change to use, occupancy, or egress.
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Installation of temporary adjacent roof protections per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Architectural demo scope only associated with the ROOF work at the New School. No change of use, egress or occupancy.
Installation of 33.88 kw solar energy system on roof. No change of occupancy, use or egress.