168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Renovate existing apartment 5a: kitchen and bathrooms, minor demolition of non-load bearing partitions, new partition, cabinetry & kitchen flooring, bathroom's wall tiling as per p…
Interior demolition of non-bearing gyp. bd. partitions. Installation of new non-bearing gyp. bd. partitions, doors, frames, finishes. No change in use occupancy or egress.
Erect 8' high temporary plywood construction fence along lot 03 in conjunction with demolition
Proposed demolition of a section of a wall for a new opening to give access from new lift. no change in use, egress or occupancy.
Filing for interior demolition of non-load bearing partitions and general construction of an apartment unit. No change of use, egress or occupancy.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Demolition application in conjuction with permitted demolition application #421810017. full demolition application for a funeral establishment with a request to waive not backfilli…
Wempe - new interior walls (demolition and construction), ceilings & finishes; new millwork and related construction as per plans. no change in use, egress or occupancy.
Site fence filing inconjunction with demolition job
Hereby filling for full demolition work of 1 story frame shed at 24 rear mount hope place with bin number as 2117792
Full demolition of high 2 story w/ mezzanine building located at 28 west 37th street, manhattan, ny 10018.
Renovation of an existing apartment# 3W on the third floor. Work to include non-structural demolition and general construction as per plans filed herewith. No change change to use,…
Interior demolition of non-load bearing partitions as per plans filed herewith. no change to use, egress or occupancy.
interior renovation of existing cellar, basement and three stories, conversion of cellar and 01 from community facility to residential use. Demolition and construction of misc. non…
Interior renovaion of the third floor including minor demolition as per plan. no change of egress, use and occupancy.
Erect 8' high temporary plywood construction fence along lot 03 in conjunction with demolition
Renovation of existing medical space including minor demolition or non load bearing, non fire rated partitions, & replacement of interior wall & floor finishes. No change to use oc…
Partial demolition work in coordination with proposed conversion as per plans filed.
Means & methods for structural alteration, filed in conjunction with m00945823-s4. includes phased selective demolitions of portions of levels & temporary shoring & bracing.
Interior renovation and combination of existing coop apts. #2A and #2B in compliance with TPPN 3/97. Work to include non-structural demolition, general construction and related fin…
Partial demolition as shown on drawings filed herewith.