Search Building Permits
194 permits · Electrical · NY
Alterations/modifications to existing 1st and 2nd floor to support electrical update to hospital as per plans. No change in use, egress, or occupancy.
Interior alteration within existing tenant space on 1st floor in existing building: new electrical hot water heater, new plumbing fixtures per new floor layout, new plumbing fixture calculatio,n new r...
Support of excavation only for electrical conduit to be filed separately
Restoration following an electrical fire that caused substantial damage to interior framing, flooring, drywall, windows and mechanical equipment. Reconfigure third floor bathroom and laundry. Sub docs...
Support of excavation only for electrical conduit to be filed separately
Restoration following an electrical fire that caused substantial damage to interior framing, flooring, drywall, windows and mechanical equipment. Reconfigure third floor bathroom and laundry. Sub docs...
Interior alteration within existing tenant space on 1st floor in existing building: new electrical hot water heater, new plumbing fixtures per new floor layout, new plumbing fixture calculatio,n new r...
Alterations/modifications to existing 1st and 2nd floor to support electrical update to hospital as per plans. No change in use, egress, or occupancy.
Construct a one-story cmu structure to house the electrical equipment. no change to use, egress or occupancy.
Cellar to be legalized as accessory of the first floor, with 2 pieces bathroom (toilet & lavatory), laundry area (washer, electrical dryer, and slop sink).
Proposed removal of erected walls at cellar, removal of kitchen and bathroom to remove violations # 39152662p, 39152663r, 39152664z and 39152661n. plumbing and electrical applications filed separately...
Proposed removal of erected walls at cellar, removal of kitchen and bathroom to remove violations # 39152662p, 39152663r, 39152664z and 39152661n. plumbing and electrical applications filed separately...
Cellar to be legalized as accessory of the first floor, with 2 pieces bathroom (toilet & lavatory), laundry area (washer, electrical dryer, and slop sink).
Construct a one-story cmu structure to house the electrical equipment. no change to use, egress or occupancy.