Search Building Permits
8,821 permits · HVAC
Addition and/or Alterations - EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations...
Mechanical modifications to include hvac replacement and replacement of associated ductwork. no change in use, egress or occupancy.
Replace existing gas boiler, hot water heater and dryer in the cellar. construct a new three-fixture bathroom in the cellar. replace existing residential stove on first floor and install new plumbing...
Installation of new hvac systems & ventilations systems along w/ associated ductwork & piping as indicated on the drawings filed herein.
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Nycha boilers-
1) installation of gas furnaces with split system dx coils for heating and cooling. 2) installation of exhaust and erv systems for ventilation.
Install new h.w.h., boiler, bathroom and kitchen fixtures in the existing 2 story building. plumbing works as per plan. no change in egress, use, or occupancy.
L-4 CARDIOLOGY Phase 4 : HVAC MODIFICATIONS TO ACCOMMODATE THE PHASE 4, CARDIOLOGY, IN THE EXISTING HOSPITAL BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY.
Installation of 2 air conditioners-Stand Alone
Install new A/C system
Minor alteration
Replace existing AC system
Minor alteration
Replacement of two AC Systems to include replacement of two exterior AC Units.
HVAC tenant fit-out including installation and replacement of air conditioning and ventilation equipment, associated ductwork and piping, and related controls within the existing ground-floor tenant s...
Modifying ductwork & supply diffuser to accommodate new partition layout, Demolition of existing AC systems & ductwork .Adding air conditioning units to the 2nd floor to supplement the removed systems...
Modifications to the existing HVAC system and associated ducts and piping on the 32nd Floor (EQT), as per plans. No change to use, egress, or occupancy.
replace existing ducts with new layout on existing existing HVAC system on portion of the 10 floor in conjunction with Alt # M01349165 as per plans filed
Replacement of brick masonry, replacement of steel lintels, replacement of 3-wythe parapets, replacement of thru wall air conditioner sleeves, and replacement of coping stone. No scope of work at the...