Search Building Permits
2,860 permits · HVAC · NY
Plumbing work associated with installation of 2 boilers and indirect water heater. no change to use, occupancy, or egress.
Proposed mechanical work associated with the gc job. install ductless mini split air conditioning units. no change to use, occupancy or egress.
Plumbing work on existing roughing in cellar including relocation of existing meter bar from cellar to OSP, replacement of furnace, tankless hot water heater. All work performed on existing gas piping...
Modifications to the existing HVAC system on the cellar and 1st floors as per plans. No change to use, egress or occupancy.
Installation of new boiler system as per plans and decommision of existing boiler (67841-03)
Herewith filing to replace split-system air conditioning units, cooling coils and upgrade HVAC controls as per the drawings. No change in use egress or occupancy
Filing herewith to PROVIDE ELECTRICAL CLOSET FOR RELOCATED EQUIPMENT., AN ELEVATED STEEL FRAMED BOILER ROOM,AND A NATURAL GAS OPTIONAL STANDBY POWER GENERATOR ON STEEL PLATFORM.
Proposing to renovate & expand tenant space - remove & install new walls, Partitions, ceiling/flooring finishes, casework, equipment, wall treatment, replace existing storefront, install new exterior...
Installation of new gas boiler on existing piping as shown on the drawings filed herewith. No change in use, egress, or occupancy.
Installation of new boiler, burner, breeching, fan, and associated piping / wiring / controls. No change in use, egress or occupancy.
New 2 story horizontal addition at side yard and 2nd floor vertical addition over existing 1 story at rear. gut interior, new partitions, doors, windows, kitchencabinets, trim, finishes and hvac as pe...
Install (4) replacement boilers as per plans. no change in use, occupancy, or egress.
Install new gas piping for (4) replacement boilers as per plans. no change in use, occupancy, or egress.
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy.
Filing herewith installation of the fuel storage and dispensers to serve the ems fleet and building emergency power generator as per plans in conjunction with nb application # 210181346. no change in...
Modifications to the existing HVAC System on the 10th Floor as per plans (Hines - ADA Restrooms.) No change to use, egress or occupancy.
Removal of existing 275gal fuel oil tank, installation of a new 275gal fuel oil tank connected to existing emergency generator at shepard hall, and installation of 275gal temporary tank for existing g...
SP: Remove and replace all sprinkler heads associated with the installation of new HVAC work. Note: this application is filed to separate the plumbing & sprinkler filings and to supersede the original...
Interior mechanical demo & modification to existing HVAC units for existing community facility building. No change in use, egress or occupancy.
1)installation of gas furnace with split system dx coil for heating and cooling. 2)installation of split-system heat pump unit for heating and cooling of 3rd floor bedroom.3)installation of exhaust an...