168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Herewith filing architectural work as per plans. no change in use, egress or occupancy
Installation of sidewalk shed and construction plywood fence as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy…
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under thi…
Herewith file to erect temporary construction plywood fence. no change to use occupancy or egress
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Filing for fence application, installation of 8'-0plywood construction fence
Modify sprinkler system according to new layout on the 1st floor subsequent with dob now job#m01341251.no change in use,egress and occupancy.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Installation of pipe scaffold as per plans. pipe scaffold shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under thi…
Conversion of existing 2 family double duplex townhouse to 2 family 1+3 gardenapartment and triplex.
Minor partition work throughout per plans. combining existing apartments 4c & 4d under tppn 3/97
Construct two family residence with accessory off street parking for two cars.
General Construction to take place on the 15th floor as per plans filed. No change in use, egress, or occupancy.
Installation of 728' new sidewalk shed as indicated on plans. there will be no change in the use, egress, or occupancy under this application
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Selective removal and replacement of deteriorated stone and terra cotta at the fifth floor terrace balustrade/watertableand second floor balustrade.
Removal & installation of non-load bearing partitions as per plans filed. no change to use, egress or occupancy.