168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
interior soft demolition on first floor per plan. removal of (e) non-structural partitions and kitchen equipment and plumbing. no exterior changes.
nov 202655709 remodel e kitchen and e living rm at 2nd fl. add new powder rm and relocate e bedroom at 2nd fl. convert e lightwell into living space 18.62 sq ft. relocate washer dr…
23rd fl/unit 2309: interior remodel. replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room entry area. there is no exte…
Demo the (e) sfd and detached garage - sewer cap required
Eplan. demo (e) one story sfd w/ attached garage by handwreck method - sewer cap is required see comment
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
replace (e) drywall throughout the entire house. (no exterior change, no electircal, no plumbing work)
to comply with nov 202538778 at 4/fl to remove (e) plumbing fixtures and door. infill door opening and provide (n) attic access. 3/fl legalize (e) window infill at bathroom. add a…
(1) Bathroom remodel for residential buildings (no structural changes) INCLUDING PLUMBING
Eplan: demolish (e) 3-unit apartment building. sewer cap & pedestrian protection fence required.
EPLAN: Supplemental to PCIS# 25010-10000-04879 To revise washer and dryer location, water heater location, skylight addition in bathroom and revise shear wall details. Per inspecto…
revision to pa 202512151833 bldg a minor plumbing upgrades
Demo (e) sfd with detached garage. sewer cap and pedestrian protection fence is required.
Suupl. permit to 24010-20000-03710. revise t24 energy report to gas fuel type.
Eplan. Demolish (E) SFD w/ attached garage. Sewer cap and pedestrian protection fence required.
Eplan: supplemental to 25016-10000-29735 to route plumbing work into floor slab and revise framing plan
convert living room into bedroom. no exterior changes. no plumbing work. remove fireplace interior
renovation of 3rd/f unit (155 noe) new skylight above kitchen & parapet fire wall protection. kitchen remodel. new tankless water heater in unit to replace existing garage
Demolition for (e) 2 story mortuary building by dozer or loader wrecking.fence the lot and sewer cap require.
Demo (e) detached garage with storage - sewer cap not required. pedestrian fence required
plumbing plans for 202512151752. relocate drain line and moving sink.