168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
occupant load review for intermitent use of lobby as assembly in support of sffd operational permit.
2 bathroom remodels inkind, toilet replacement, new vanity cabinet, replace tub, replace tiles.
water damage repair to sheetrock, install new insulation and shearwall for seismic reinforcement. repair decking plywood on back deck, < 50% repair, replace (4) windows and (2) doo…
construct 1 bedroom, 1 full bath at g/f. remodel (e) kitchen, living room, & add half bath on 2/f. remodel (e) bathroom & construct cantilevered deck at 3/f. construct (n) deck w/…
add 1 full bathroom, remodel kitchen, and replace 3 windows.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
revision 202307283261 and ref 202410039947 to include rear yard layout and patio walls. revisie foundation details at north and south property lines to match (e) conditions. revise…
excavage and installl new rear yard retaining wall in front of failing brick retaining wall
to obtain final inspection for work approved under pa#: 202501279160. all work is complete.
revisions to pa #202510248057. change function of 2 windows on rear elevation.
& to obtain final inspection for work approved under pa# 202502100007 & 202503111989. all work is complete.
repair 2 deteriorating joists and deck boards. re fasten guard railing. all work at balcony second floor, non street visible, less than 50% repair.
add a shoring permit for construction. main permit pa# 202512041041
revision to pa #202407186789, minor revision to footing at 1st floor stair wall, and python fasteners as approved in permit pa #202605040620.
unit 3: at existing mezzanine - infill floor opening, replace 2 skylights, add 2 new heat pumps.
fire alarm as builts. delta 3 includes the final inspection inspection inspectors corrections so the plans match field conditions. ref#202306089630
revision 202607084698- replace 5/8in drywall in bedrooms and hallways and living room for appox 5450 sq ft . no wall removal or layout change
garage conversion with interior renovation
comply with nov202656052. replace garage door and do framing repairs due to damage caused by car into building.
improvements in lobby including (n) finishes, light fixtures, an entry stair, relocated security station, mail area, accessible toilet.
improvement in porte cochern: n) entry portal elevation. addition of metal panels at east & west ends, n) lighting, relocated sffd signal booster & security camera locations, insta…