5,335 permits · HVAC · NY
Installation of temp Tent, platforms, no alt to exist structures for Tony Awards Red Carpet. A TPA permit is required. Producer is responsible to monitor site safety & implement HWAP. All production e...
Mechanical modifications taking place on the 7th floor as indicated on the drawings.
Subsequent filing for plumbing work. install bathroom, kitchen, and boiler room. no change in use, egress, or occupancy.
Filing for louver replacement, minor facade repair of existing masonry disturbed by louver replacement and pad extension related to boiler replacement/removal per plans filed. no change to use, egress...
Renovation of cellar mechanical room - nycha boilers. work includes install new louvers-replace doors & frames-miscellaneous site work, including areaways-replace finishes
Replacement of HVAC equipment (Vacuum pump, condensate pump)
Installation of the new concrete pads for mech. equipment in tank rooms and boilerroom. create new opening in the exterior masonry walls. new concrete area ways at tank rooms.
Filing for pad extension related to boiler replacement/removal per plans filed. no change to use, egress or occupancy.
Filing herewith mechanical work for community facility fit out as per plans. no change is use, egress, or occupancy.
Removal of existing tank room mechanical, heating and domestic hot water system. installation of new hot water pumps and associated piping and ducts. no change in use egress or occupancy.
Removal of existing tank room mechanical, heating and domestic hot water system. installation of new hot water system and associated piping and ducts. no change in use egress or occupancy.
Removal of existing tank room mechanical, heating and domestic hot water system. installation of new hot water system and associated piping and ducts. no change in use egress or occupancy.
Filing for associated ducts & piping, pumps for replacement of domestic hot water system per plans filed herewith. all pl and gc work to be filed under separate applications. no change to use, egress...
Propose filing of general construction and mechanical applications in response to ECB violations 39155929Z & 39155928R and removal of full stop work order, as per plans filed herewith.
Installation of (2) 15 ton ac units and associated ductwork on 5th floor as per plans. no change in use, egress or occupancy.
Mechanical modifications taking place on the 10th floor as per plans filed herewith. No change in use, egress or occupancy.
Mechanical modifications taking place on the 7th floor as per plans filed herewith. No change in use, egress or occupancy.
Replacement of existing vacuum and condensate pumps, installation of combustion air ductwork and flues for new domestic and hot water heaters.
Filing for pad extension related to boiler replacement/removal per plans filed. no change to use, egress or occupancy.
Modification to Mechanical Systems as per plans filed herewith.
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.