168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Installation of new sprinkler heads & piping in cellar, first & second floors from main fire protection service after existing back flow preventer assembly.
Q595_Provide (2) new electric unit heaters for sump pits.
Application filed for removal of non-load bearing partitions, ceiling, flooring, and finishes, electrical, mechanical, and plumbing equipment's. No change to Use, Egress, or Occupa…
Application filed for removal of non-load bearing partitions, ceiling, flooring, and finishes, electrical, mechanical, and plumbing equipment's. No change to Use, Egress, or Occupa…
Install fire sprinkler system as per plans.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Install fire sprinkler system as per plans.
Work without a permit at rear of premise a vertical and horizontal extension has been erected with plumbing and electrical work and a rear yard deck. Legalize rear extension and re…
Work without a permit at rear of premise a vertical and horizontal extension has been erected with plumbing and electrical work and a rear yard deck. Legalize rear extension and re…
Gas piping modifications in support of mechanical equipment renovations. Replacement of 4 thermometers and rewiring of aquastat for the domestic hot water system.
Proposed alteration to the existing apartment #9C to include new bathrooms, kitchen, plumbing, mechanical and electrical work. No change to use, occupancy or egress under this appl…
Gas piping modifications in support of mechanical equipment renovations. Replacement of 4 thermometers and rewiring of aquastat for the domestic hot water system.
Proposed alteration to the existing apartment #9C to include new bathrooms, kitchen, plumbing, mechanical and electrical work. No change to use, occupancy or egress under this appl…
PS244-Q: One sprinkler will be removed and relocated as to be out of future electrical room.
Propose to install 2 exterior electrical condenser units with interior split units as per the plans submitted herewith.
Jacobi Medical Center proposed Electrical Lighting work interior renovation of an MRI on ground, 3rd and 4th Floor. No change in use, egress or occupancy. All as per plans filed he…
PS244-Q: One sprinkler will be removed and relocated as to be out of future electrical room.
Propose to install 2 exterior electrical condenser units with interior split units as per the plans submitted herewith.
Filing to establish electric vehicle charging facility as per plans filed herewith.
Filing to establish electric vehicle charging facility as per plans filed herewith.
renovate apartment 8G, partition, plumbing, electrical work, partial window replacement, no change to use, exits or occupancy