168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Proposed to install structural bracing and members to support HVAC system, all as per plan. No change to use, occupancy or egress.
Removal and installation of HVAC units with associated piping and ducts. No change of use or occupancy or egress.
Remove ductwork, grills & registers in office area being removed
Protection & Mechanical Methods application for installation of elevator hoist in conjunction w/ JOB#: M01384654-I1-VT
MH work as per plans filed
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Modification of existing mechanical system. no change to use, egress, or occupancy.
Filing for obtaining certificate of compliance of existing a/c. no change of use, egress and occupancy.
Filing to replace existing hvac and install condensing units as per plan. no change in use, egress,m or occupancy
Mechanical work as per plans filed in conjunction with alt1 220712904.
Storage of material / equipment on top of heavy duty sidewalk shed. storage shall not exceed 25 psf. shed filed under separate application. storage shall comply with ch#33 of the n…
Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applicatio…
installation of TEMPORARY SITE SPECIFIC engineer enclosure system netting on scaffolding. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Installation of a new mechanical system
Replace unit heaters, convectors, finned-tube radiators throughout 1st floor. Replace hot water pumps and hydronic piping throughout basement.
*Green Building* New 1-story 3 bedroom 2 bathroom single family residence with attached garage covered front porch and rear covered patio. Revision 1: Revise house plan from an X35…
Replacement of complete existing central heat and air system with or without duct work Replacing existing gas system and plenum.
2nd story addition above garage adding game room to existing 2-story single family residence
Interior alteration of approx. 8212 SF of existing interior office space. Re uploaded unit suite request ticket. [Suite 375]
Minor renovation of an existing classroom and student mental health center into areas serving an LHMP office student mental health center community in schools parent support specia…
ePlan: Residential Expedited Review - SITE PLAN APPROVED: PHASE A - Greystar Plan A583 New 2 story attached unit with 2 bedrooms 2.5 bathrooms and a 1 car garage