Search Building Permits
45,636 permits · Other
Modification of Sprinkler System as shown on plans
Installation of temporary construction chain link fence as per plans. no change in use, egress or occupancy.
Filing structural work to the existing building as per plan filed herewith. No change to use, egress, and occupancy.
Filing herewith for the foundation work type
Full rebuild (same as existing) for wood porch (open) (quantity: 1, location: rear of building).
Self-cert cbc 2019 crb: new 2 tier open wood rear deck w/composite decking and metal pergola w/ outdoor kitchen. new pump room to basement to a 2 story va frame single family residence with basement....
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. sidewalk shed and pipe scaffolding shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under th...
Storage of material / equipment on top of heavy duty sidewalk shed. storage shall not exceed 50 psf. shed filed under separate application. storage shall comply with ch#33 of the nyc bldg code. no cha...
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application
Installation of a temporarily Plywood Enclosure per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of a temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of pipe scaffolding. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy.
Construction Fence
Installation of new (1) 2 ton air cooled and new (2) 4 ton air cooled split systems at 1st floor retail.
Proposed temporary construction field office per plans filed herewith. no change in use, egress or occupancy.
Filing herewith sprinkler work as per plans.
Filing to install store kitchen hood and ductwork as per plans. no change in use, egress or occupancy.