Search Building Permits
5,397 permits · Roofing · NY
Rooftop solar installation. no change to use, occupancy or egress.
Rooftop Solar installation. No change to use, occupancy, or egress.
Installation of solar panels, rooftop, grid tied, railed, 19 modules, 8.265 KW
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
installation of solar panels, rooftop, railed, grid-tied, 7 modules, 3.045 kw
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
Installation of solar panels, rooftop, railed, grid-tied, 16 modules, 6.56kw
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Installation of solar panels, rooftop, railed, grid-tied, 19 modules, 8.265kw
Installation of solar panels on existing roof. no change in use, occupancy, or egress. no change in bulk
Wall removal and replacement in conjunction with replacement of existing chiller on the roof. mechanical and structural work filed as subsequent. no change in use, egress or occupancy under this appli...
Replace existing chiller on the roof, as per plans. gc and str. work filed separately. no change in use, egress, or occupancy under this application.
Disconnect existing rooftop unit from gas supply line, electricpower & duct system. remove existing rooftop units. install packaged gas rooftop units on existing dunnage support. connect new rooftop u...
Structural scope only associated with the renovation of the 005 FL at the New School including dunnage on a roof. No change of use, egress or occupancy.
Installation of non-emergency gas fired generator with related gas booster pump on new steel dunnage platform on roof. No change to occupancy, use, or egress.
Installation of temporary roof protection as per plans. no change in use, egress or occupancy.
Alteration to Floors Cellar, 001-008, and Roof with change to certificate of occupancy per plans filed herewith.
provide new 100 gallon rooftop fuel storage tank w/ containment for hand fill as indicated on plans & per BB 2011-001 for buildings constructed prior to 1968. No change to use, egress or occupancy.
Structural work to support electrification project at the building. Includes new steel rooftop dunnage and new slab openings for MEP runs.
Remove and install new walk-in frezer. Construct gyp. bd chase on 2nd, 3rd, and 4th floor. Install new condenser unit on roof.