5,372 permits · HVAC · NY
Relocate (2) registers and associated flex ductwork over 3 ft.
New stairs to rec room. Kitchen renov. Openings at rear exterior walls, new windows. Excavate for 8'0 ceiling ht in cellar. Stay back from existing footings. New areaways in rear yard. New mini split...
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
Modifications to existing Mechanical Systems as per plans filed herewith.
Replace boiler, h.w.h.,bathroom and kitchen fixtures in the existing 2 story building. plumbing works as per plan. no change in egress, use, or occupancy.
Interior reno:Bronx Family courtroom, dividing 2000SF room in 3 small hearing & Conf. rooms. Room at 2nd Fl-double ceiling, vinyl floor, HVAC & electrical system removal. Add new vinyl floors,ceiling,...
Replacement of wood floor finish at gymnasium. Installation of Wall Padding, Replacement of Limited Gym Equipment, Provision of Induction Loop in Gym Floor (Hearing Impaired)
Sub-sequence file boiler application for plumbing job # q00863714.
Hvac work as shown on plans submitted herewith. no change to use, egrees, or occupancy as of right.
Addition and modifications to existing HVAC system and related ducts and piping. No change in use, egress or occupancy.
Install energy recovery units, exhaust fans, split vrf heat pump system and ductwork throughout the entire single-family home.
Scope of work includes installation of new HVAC systems per modifications for renovation of roughly 4,360 sq.ft. Lobby space. No change of use, egress, or occupancy.
Foundation work to be conducted.
Cap and remove existing boiler. install and replace plumbing fixtures on basement, 1st, 2nd, and attic for an existing one family house.
Application filed for mechanical additions/modifications on floors 003 thru 007 as per plans filed herewith. no change in use, egress or occupancy.
Filing to remove and install new mechanical systems as per plans filed. no change to use, egress or occupancy.
Replace burner on existing boiler. No change in use, egress or occupancy.
Install new hvac 5 tn mini split unit for a first floor commercial space and (2) hvac mini split units for exist (2) apartments at second floor.
Mechanical work for office fit out for Croud on 9th floor
Existing heating and hot water boiler plant to be removed and replaced with new combined heating plant, all existing piping, valves, heat exchangers, tanks pumps to be removed. Al new hydronic equipme...
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com