5,372 permits · HVAC · NY
Existing heating and hot water boiler plant to be removed and replaced with new combined heating plant, all existing piping, valves, heat exchangers, tanks pumps to be removed. Al new hydronic equipme...
Modification of the HVAC distribution and controls as shown in the drawings filed herewith.
Replace burner on existing boiler. No change in use, egress or occupancy.
Mechanical work for office fit out for Croud on 9th floor
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH. (Installation of new HVAC systems, including heating and cooling units, associated condensers, mechanical exhaust systems, and exhaust ductwork and as...
Q018, installation of temporary chimney, steam, condensate, and make-up water piping to connect temporary mobile boiler during renovation of main building heating plant in conjunction with dob # 42190...
Filing for new mechanical HVAC split units as per plan
Proposed Duct and Vent Exhaust for Bathroom, Dryer & Cooking range as per plans.
NYCHA BOILER-CARVER_BLDG #5_Remove exist steam-fired domestic hot water heat exchanger. Remove & replace sump pump. Install new gas HWHs, storage tank, floor drains and sanitary lines, gas piping. Pro...
Mechanical work filed in conjunction with dob now gc and pl. no change to use, occupancy or egress.
NYCHA BOILER-CARVER_BLDG #5_Remove and replace existing steam boiler plant with new boiler plant.
Application filed to install new ductwork and new kitchen exhaust fanas per plans. fire suppression system filed separately with thefdny. no change to use, egress, or occupancy.
Due to new owner install new bathroom at 1st & 2nd floor ,relocating kitchen,change of boiler oil to gas & replace all plumbingfixture, conjunction with gc job b01327519-i1
Hvac modifications associated with interior renovation of existing digital movie theatre auditorium 1 (dolby) as per plans filed herewith. no change in use, egress or occupancy.
Mechanical work as shown on plans. Work to include make up air unit and exhaust fans for kitchen hoods and associated ducts.
Installation of hvac blower units on 2nd floor and hvac condensing units at rear yard with access metal ladder at rear of building
Removal of existing high pressure steam service and installation of three (3) new boiler, burner, breeching, fan, and associated piping / wiring / controls. No change in use, egress or occupancy.
Replace gas train and reconnect existing gas line to replacement boiler / burner .
Decommission and abandon in place existing indirect domestic water heaters, recirculation pump, and associated piping with valves; provide new domestic water and gas piping from the cel to a new boile...
Filing for new mechanical HVAC split units as per plan
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com