5,372 permits · HVAC · NY
Mechanical work for office fit out for Croud on 9th floor
Mechanical modifications as per plans filled herewith. No change in use, egress or occupancy.
Cap and remove existing boiler. install and replace plumbing fixtures on basement, 1st, 2nd, and attic for an existing one family house.
Hvac installation for an existing 2 family, 2 story and basement townhouse. no change in use, bulk, occupancy or egress.
Filing to remove and install new mechanical systems as per plans filed. no change to use, egress or occupancy.
NYCHA BOILER-CARVER_BLDG #5_Remove exist steam-fired domestic hot water heat exchanger. Remove & replace sump pump. Install new gas HWHs, storage tank, floor drains and sanitary lines, gas piping. Pro...
Due to new owner install new bathroom at 1st & 2nd floor ,relocating kitchen,change of boiler oil to gas & replace all plumbingfixture, conjunction with gc job b01327519-i1
File mechanical work for the installation of ducted central air inverter heat pump split system at existing office on the 12th floor as per plan. no changes to use, egress, or occupancy.
Application filed for mechanical additions/modifications on floors 003 thru 007 as per plans filed herewith. no change in use, egress or occupancy.
Application filed to install new ductwork and new kitchen exhaust fanas per plans. fire suppression system filed separately with thefdny. no change to use, egress, or occupancy.
Proposed Duct and Vent Exhaust for Bathroom, Dryer & Cooking range as per plans.
Installation of mechanical system as per plan filed herewith. no change in use, occupancy or egress.
NYCHA BOILER-CARVER_BLDG #5_Remove and replace existing steam boiler plant with new boiler plant.
Replace gas train and reconnect existing gas line to replacement boiler / burner .
Foundation work to be conducted.
Mechanical work to include replacement of existing chiller, heat exchanger, and cooling tower along with associated ducts and piping as per plans filed herewith. no change in use, egress, or occupancy...
Mechanical work filed in conjunction with dob now gc and pl. no change to use, occupancy or egress.
R009, installation of temporary chimney, steam, condensate and make-up water piping to a temporary mobile boiler trailer on behalf ofcontractor in conjunction with dob # 500875742 . no change in use,...
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH. (Installation of new HVAC systems, including heating and cooling units, associated condensers, mechanical exhaust systems, and exhaust ductwork and as...
Hvac modifications associated with interior renovation of existing digital movie theatre auditorium 1 (dolby) as per plans filed herewith. no change in use, egress or occupancy.