5,372 permits · HVAC · NY
Installation of exhaust hood & duct at existing store (001). no change in use, egress, and occupancy under this application.
Mechanical work as per plans filed, in conjunction with alt co #b01117069-i1
Herewith filing for the installation of mechanical units and related ducts, as per plans submitted.
Mechanical work for tenant Slarskey on 32nd marketing floor (31st construction)
Mechanical work as per plans filed herewith
Filing to update the mechanical systems for the base building infrastructure as shown per plan. Please see comments for full description.
Filing herewith the mechanical work to the existing system as per the plans. No change to use, egress, or occupancy.
P.S. 273-K:Toilet and elev.machine rm. exhaust fans and ducts-split system air-cooled heat pump system and refrigerant piping for new elev. mach. rm. Split system air-cooled fan coil unit serving 3rd...
Filing for hvac units for commercial space fit out as per plans filed herewith in conjunction with alt2# 421945140. no change in egress, use or occupancy.
Scope of work includes the replacement of gas boilers and associated piping and ductwork.
Install new ductwork and diffusers per new layout. install new vav box and control. connect new ductwork to existing building hvac system. install new exhaust fan and ductwork at existing tenant space...
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Full interior gut renovation with all new non-load bearing partitions, doors, sheetrock, bathrooms, kitchens and finishes on 1st and 2nd floors. new bathroom and boiler rm in cellar. existing structur...
HEREWITH FILING MECHANICAL APPLICATION FOR INSTALLATION OF HVAC EQUIPMENT AS PER PLANS SUBMITTED. In conjunction with the GC application #'s M01191101, M01191238. NO CHANGE IN USE, EGRESS OR OCCUPANCY...
Replacement of one(1) existing dual-fuel boiler/burner with one(1) new dual-fuel boiler/burner, existing storage tank to remain, as per plans filed herewith. no change in use, egress or occupancy. see...
Installation of temporary gas piping to temporary boiler as per plans filed herewith.
Modify existing curtain wall and rear exterior wall of the hotel building for new HVAC unit installation in guestrooms from 2nd to 17th floor. No change to use, occupancy, egress.
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Replacement of one(1) existing dual-fuel boiler/burner with one(1) new dual-fuel boiler/burner, existing storage tank to remain, as per plans filed herewith. no change in use, egress or occupancy. see...
Provide duct layout changes to the existing HVAC system in conjunction with Alt #M01349048 as per plans filed no change in use occupancy or egress