168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
212 goforth dr - bsb order
Plans present means and methods for the proposed partial demolition in conjuction with related full demolition m01004546 to remove awnings to facilitate installation of sidewalk br…
Scope of work includes interior demolition of partitions and finishes on the 4th floor as indicated on plans. no change in occupancy, use or egress.
Partial demolition of rear first floor facade. Removal of interior partitions on first and second floor. Construction of new room on second floor over existing first floor.
Full demolition on existing 1-story garage in side yard.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Interior demolish of non-bearing interior partitons and suspended ceilings. no change in use occupancy or egress proposed under this application.
Scope of work includes interior demolition of partitions and finishes on the 9th floor as indicated on plans. no change in occupancy, use or egress.
Total demo of SFR 4490 sq ft circa 1929 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification r
Total demo of pool 364 sq ft circa 2021 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification req
711 w gerald - bsb order
Express- Exploratory non structural demolition
Allow two new detached accessory dwelling units (within one structure) to existing single family use per land use code. Construct two-family dwelling per plan. Existing detached ac…
Demo of private car garage
Interior Renovation Preparation application including interior demolition of existing partitions for existing two family residence building
Remove (2) sprinkler heads and associated piping in room 336. branch off feeding demolished space shall be rerouted to accomodate relocated sprinkler heads as per new room layout.
Application filled to full demotion of existing one car garage.
City Funded Demolition 1. EMERGENCY CURB-SIDE DEMOLITION. Remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing. 2. Contract term 20 da…
Demolish
Demo existing 2 story house
Removal and installation of interior non bearing partitions to 1st Floor and Sub Cellar Level with New Interim Dining space and Kitchen Office. Scope of Work includes Demolition, N…