168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Rapid Review-Express- Plan Type 3A - TORREY HILLS. Building and electrical permits for a tenant improvement of 91 existing apartment units located throughout 21 existing apartment…
Rapid Review-Standard-Building Construction:6455/La Jolla - LA JOLLA: No Plan building, electrical & plumbing permits for the Remodel of ( 1 ) existing bathroom. No changes to stru…
Rapid Review-Express-Building Construction:5305/Toscana - UNIVERSITY. Building and electrical permits for a tenant improvement of 309 existing apartment units located throughout 8…
*no fee. department error.* supplemental permit to 25010-20000-01645 to remove all-electric requirement from checklist
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Rapid Review-Standard-Building Construction:12394/Kingspine - SCRIPPS MIRAMAR RANCH; Combination Building Permit for the proposed demolition of (e) patio cover and for the proposed…
bathroom remodel for residential buildings (no structural changes) ELECTRICAL, AND PLUMBING INCLUDED
Supplemental to 25010-10000-00948 to capture revisions to Title 24 sheet, remove all electric Bldg from Checklist and add gas appliances to project.
Supplemental permit for 24010-20000-02374 to remove "all electric" from checklist & revise title 24 to natural gas
Rapid Review-Standard-Building Construction:6455/La Jolla - LA JOLLA: No Plan building, electrical & plumbing permits for the Remodel of ( 1 ) existing bathroom. No changes to stru…
adding a detached non habitable accessory structure in rear yard 10x12 w/ 10' height limit, with one sink and basic electrical (outlet, switches, lights)
install (1) non-electric single faced wall sign: "frisco tattoo"
to erect electric at&t logo sign. front of building.
replace cabnetry doors in kitchen, new countertop, new electrical in kitchen and living room, & new drywall and painting.
bathroom remodel_full remodel of existing hallway bathroom on third floor, including remodel of non-load bearing wall, cancel tub, install new walk-in shower, relocate toilet and v…
replace ceiling with new drywall to rewire electrical in lower level, replacing electrical panel and gas line in garage, rewire upper and lower area. upper level, remove and replac…
change of use from retail skin care shop to retail candy shop. work includes interior painting, wallpaper, install cashwrap. no structural,electrical,plumbing. sinks to remain. no…
Rapid Review-Standard-Building Construction:1640/Camino Del Rio North - MISSION VALLEY: Building Permit for Tenant Improvements to an existing commercial space. The scope of work i…
Rapid Review-Express- Plan Type 3A - TORREY HILLS. Building and electrical permits for a tenant improvement of 91 existing apartment units located throughout 21 existing apartment…