Search Building Permits
8,827 permits · HVAC
New air conditioning and ventilation installation for apartment renovation in conjunction with GC #M01084668-I1. No change to use, egress, or occupancy. Post Approval Amendment filed to show changes t...
Repair gas lines and proposed ceiling mounted gas furnaces.
Spr 2019 crbc revision to permit number 101063978 to replace the approved 400 amp electrical service with a 600 amp service in order to replace the approved gas furnaces and hot water heaters with ele...
Interior & exterior remodeling of the existing restaurant to a new restaurant including architectural, electrical, hvac and plumbing work.
Spr 2019 cbrc: revision to permit 101064832 to remove bakery from scope of work, including oven & hood. remove all walk-in coolers, leaving only standard reach-in coolers & freezers. all existing hvac...
Modifying ductwork & supply diffuser to accommodate new partition layout, Demolition of existing AC systems & ductwork .Adding air conditioning units to the 2nd floor to supplement the removed systems...
Modifications to the existing HVAC system and associated ducts and piping on the 32nd Floor (EQT), as per plans. No change to use, egress, or occupancy.
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Installation of new hvac systems & ventilations systems along w/ associated ductwork & piping as indicated on the drawings filed herein.
Mechanical modifications to include hvac replacement and replacement of associated ductwork. no change in use, egress or occupancy.
Reach 7 - Temporary relocation of the HVAC system. Once construction of the proposed area is done, HVAC will be restored back to its original location. No change to use, egress or occupancy.
Replace existing gas boiler, hot water heater and dryer in the cellar. construct a new three-fixture bathroom in the cellar. replace existing residential stove on first floor and install new plumbing...
L-4 CARDIOLOGY Phase 4 : HVAC MODIFICATIONS TO ACCOMMODATE THE PHASE 4, CARDIOLOGY, IN THE EXISTING HOSPITAL BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY.
HVAC tenant fit-out including installation and replacement of air conditioning and ventilation equipment, associated ductwork and piping, and related controls within the existing ground-floor tenant s...
Installation of new boiler as per plans filed. No change in occupancy, use or egress.
Install new h.w.h., boiler, bathroom and kitchen fixtures in the existing 2 story building. plumbing works as per plan. no change in egress, use, or occupancy.
Nycha boilers-
Self-cert 2019 cbrc: revision to building permit #101072117 due to ceiling removal resulting in mechanical and electrical adjustments to hvac distribution, lighting layout, and miscellaneous outlet mo...
Replacement of existing air conditioning units to provide cooling for existing duplex dwelling unit. Related ductwork and diffusers. Install electric radiant heat in toilet. No change to use, egress o...
Installation of Mechanical HVAC system including heating and cooling equipment, ventilation duct work & fans, and mechanical piping in conjunction with job# B00989327-I1