Search Building Permits
2,835 permits · HVAC · NY
Nycha boiler - mechanical equipement and associated piping in existing boiler room.
installation of construction fence around temp boiler and oil tank
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
Filing herewith installation of boiler as per plans inconjunction with nb application 210181346. no change in use, egress, or occupancy.
Abandon existing fuel oil storage tank as per plans. no change in use, egress or occupancy.
Removal of existing 275gal fuel oil tank, installation of a new 275gal fuel oil tank connected to existing emergency generator at shepard hall, and installation of 275gal temporary tank for existing g...
Modifications to the existing HVAC System on the 10th Floor as per plans (Hines - ADA Restrooms.) No change to use, egress or occupancy.
Demolish all existing mechanical systems & provide complete new HVAC system for new apartments and all BOH areas throughout the entire renovated building. No change in use, egress or occupancy.
replace and provide new PTHP's & HVAC equipment as indicated on plans including hallway ventilation system and spot heating equipment as indicated on plans.
Install new gas piping for (4) replacement boilers as per plans. no change in use, occupancy, or egress.
Install (4) replacement boilers as per plans. no change in use, occupancy, or egress.
Interior mechanical demo & modification to existing HVAC units for existing community facility building. No change in use, egress or occupancy.
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
Modifications to the existing HVAC system on the 6th floor as per plans. No change to use, egress or occupancy.
Install split hvac system.
New 2 story horizontal addition at side yard and 2nd floor vertical addition over existing 1 story at rear. gut interior, new partitions, doors, windows, kitchencabinets, trim, finishes and hvac as pe...
Nycha boiler - structural work for interior renovation replacing concrete pads and enlargement of existing sump pits.
NYCHA BOILER_BLDG#9_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
NYCHA BOILER_BLDG#8_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
replace existing hvac split systems in mech penthouse. Replace mechanical piping and replace ductwork in portion of first floor. No change to use egress or occupancy under this application