168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Structural specifications filed in conjunction with nb application #x01222893-s2
Proposed interior alterations to existing 2-story building at cellar, 1st & 2nd floors. scope includes new partitions, ceilings, flooring, and painting throughout as per plans. no…
Proposed interior alteration at cel, 1st & 2nd flr of existing two (2) story building. work includes removal & replacement of flr finishes,new ceiling & painting throughout,new par…
Install sprinkler system per the plans filed herewith and in conjunction with NB#210178476. The system is hydraulically calculated. There is no change in use occupancy or egress.
Installation of temporary dry standpipe system for use during construction of new building. Filed in conjunction with NB application #121190736.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Structural work for 4 story new building with Cellar.
Foundation work as per plans filed, in conjunction with NB # B00848051-I1
Nb application for 4 family 5 story with cellar residential and commercial mixed use building
Underpinning work in conjunction with the construction of a new, nine story, mixed-use new building.
NYC DEV HUB: Foundation work in conjunction with new building construction.
Sprinkler / standpipe worktype hereby filed subsequent to the NB application: Q01288509-I1.
Install fire sprinklers in conjunction with NB. The system is hydraulically calculated. There is no change in use. occupancy. or egress.
Alt. CO addition to existing apt. unit to include GC, demo to interior and exterior partitions with installation of new structural steel, non load bearing partitions, windows, door…
Filing plumbing work type in conjunction with nb app q01261622
Erect new awning with copy. no change in use, egress or certificate of occupancy.
Proposed interior renovation of 2 family house: demo and erecting non bearing partitions, relocation 3 pc bathroom on first floor, Installation fire rated new door, refinishing flo…
Renovate apt units #s1, a2 & s3 on 2nd, 3rd & 4th floor,including removal & installation new interior partitions,lighting & finish. no change to use, egress or occupancy.
New ada ramp and entrance door
Installation of a heavy duty sidewalk shed as per plans in conjunction with nb construction. no change in use, egress or occupancy. sidewalk shed to comply with chapter 33 of nyc b…
Full building plumbing in conjunction with the nb q01230197-i1