Search Building Permits
45,636 permits · Other
Installation of IRA during facade inspection.
Mechanical work in conjunction with application B01264675-I1
Hereby filing for the renovaiton of unit 9c. no change in use, egress or occupancy.
Filing for concrete baluster fence
Mechanical work of installing ac units as per plans in conjunction with gc application #b00665487. no change in use, egress or occupancy.
Installation of temporary overhead protection as per plans. no change in use, egress or occupancy.
Sprinkler work on the 17th floor (corridor/lobby/boardroom) as indicated on drawings.
Install construction fence as per plans
Application filed for installation of new indoor/outdoor units
Removal of sprinkler heads and installation of temporary sprinkler loop on the 17th floor as indicated on drawings.
Installation of interior temporary working platofrm & overhead protection shed as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy u...
PH SP B: Sprinkler modification throughout as indicated on plans filed herewith. No change to use, egress or occupancy.
Foundation plans filing in conjunction with gc application b01224933-i1
Proposed temporary 8' high plywood construction fence around site.
Subsequent filing for mechanical work in conjunction with alt-1 job#b01124516-i1. no change in use, egress, or occupancy.
Sprinkler & standpipe specifications filed in conjunction with gc application q01261189-i1
Relocate stairs from cellar to first floor.
Sprinkler modifications Filed herewith for battery energy storage system as per plans filed herewith.
Modify existing Sprinkler system. No Change in use, egress or occupancy.
Application filed for sprinkler additions/modifications on the 14th fl as per plans filed herewith. no change in use, egress, or occupancy.