Search Building Permits
19,634 permits · Plumbing
replace, relocate and install new plumbing fixtures. no change in use, egress or occupancy.
Filing plumbing work type including underground site connection in conjunction with nb app q01169174
This plumbing application is filed in conjunction with nb application number b01241131-i1 to add new fixtures
This plumbing application os filed in conjunction with nb application number b01241382-i1 to add new fixtures
Plumbing work filed in conjuction with alt-co as per plans filed herewith.
Plumbing specifications filed in conjunction with gc application b01061260-i1
Plumbing modifications to commercial space as per plans. no change to use, egress or occupancy.
Saint john villa: subsequent civil plumbing work type for phase ii site preparation of a new school complex. job filed in conjuction s01144839, s01149913, 500877063
Remove existing fire water service point of entry piping and provide new secondary backflow prevention and meter assemblies. Modify local branch cold water piping and sanitary drainage. Provide sprink...
Interior plumbing work as shown herewith. no changes to egress, occupancy or use.
Herewith filing alteration in conjunction with alt # q01108749-i1for plumbing work in cellar, first, second & osp as per plans filed.
Plumbing work as shown herewith. no changes to egress, occupancy or use.
Plumbing filed in conjunction of 20-story nycha multiple dwelling as part of the nycha pact renovation: replacement of existing kitchen and bathroom fixtures on existing rough in, no change to use, eg...
Job filed exist. commercial space install/remove new plumbing fixtures per plan.no change of use, egress or occupancy under this application.
Herewith filing alteration in conjunction with alt # q01065694-i1for plumbing work in cellar, first, second & osp as per plans filed.
Installation of two new sinks and one dual level drinking fountain, plus height adjustment of one existing drinking fountain - all on third floor.
Interior renovation of 6-story nycha multiple dwelling as part of the nycha pact renovation: replacement of existing kitchen and bathroom fxitures on existing rough-in. no change in use, egress or occ...
Plumbing and sprinkler work associated with eating or drinking establishment tenant fitout work.
Application filed for plumbing/sprinkler modifications/additions on the 6th floor (altfest) as per plans filed herewith. no change in use, egress, or occupancy.
Plumbing work filed in conjunction with renovation of 5-story nycha multiple dwelling as part of the nycha pact renovation: installation of new sanitary, storm, domestic water, sanitary vent and gas p...