168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Installation of outrigger for facade repair & inspection.
Replace main entrance doors and vestibule doors. egress will be maintained
Facade repairs to comply with local law 11/98. no change in use, egress or occupancy.
Interior renovation of apartment 2b and suite 9 on the 2nd floor. no change to use, egress, or occupancy.
Perform wood, steel, and masonry repair work due to previous fire incident to permanently stabilize building to allow for removal of vacate order and violations. no changes to use,…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Propose to gut rehab an existing masonry structure with floor system, including replacement of the structural and nonstructural building elements such as rotted floor joists, ruste…
Install exterior illuminated wall sign (the home depot rental)
Interior renovation of a two bedroom apartment in a two family house; work includes a kitchen, two bathrooms, and two bedrooms. all as per plans submitted herewith. no change in us…
Garage repair including replacement of deteriorated sealant, vertica, overhead, topside, and full depth concrete repairs, and traffic coating replacement as per plans filed herewit…
Installation of outriggers for the facade repair work as per the submitted plan
Removal and construction of interior partitions, doors and ceilings as shown on drawings. No change in use, egress or occupancy.
Sprinkler modifications associated with interior renovation.
Facade repairs: Miscellaneous stone, terracotta , brick repair and replacement. No change in use, egress or occupancy.
Propose renovation for residential units with partition and finish work as per plan. No change in use, egress, or occupancy.
Removal of interior non-load bearing partitions, doors, and finishes.
SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo cellar door alteration, vault removal & building strengthening/protection.
Renovation of an existing dwelling unit. Architectural work as per plans. No change of use, occupancy or egress.
Q070 - Architectural work related to Replacement and repair of structural elements.
install new steel lintel for new sliding door opening at rear yard basement.
Facade repair work as per plan. no change in use, egress or occupancy.