168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
MQ202- Remove & replace existing Rooftop AC-1 & ACCU's and exhaust Fans to facilitate the roof replacement work undergoing at existing school, As per plans filed herewith .
Filing herewith mechanical work of the garage, first thru third floors and roof at 37 Dikeman Street. In conjunction with New Building Job No. B00814057-I1.
Rmve 1 exst air coold 20 t gas fired ac , 1 exst air coold 2t & 1 exst air coold 1.5t splt systm @ roof. rplce in kind w eq specs. rmve 2 exst intrior air hndlrs & rplce w new unit…
Plumbing Work to include Water Service Line with RPZ, Gas Meter Upgrade with Piping to Spray Booth Burner, 2 Gas Fired Heaters. Mezzanine floor with three Bathrooms and Pantry Sink…
Installation of temporary roof protection as per plans. no change in use, egress or occupancy.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Modification to existing verizon site. remove 1 cabinet, 1 antenna, and 2 rrh's, replace 2 antennas and 2 rrh's, and install 6 antennas, 4 rrh's, 3 mdb's, and platform with 3 cabin…
Installment of two york chillers in sub-cellar 1, sub-cellar 2 and two split daikin units on main roof, no change in egress or occupancy.
General construction for limited exterior facade & roof repairs as per plans filed herewith. no change in use, egress or occupancy.
Facade restoration and roof repairs as indicated on plans filed herewith. no change in use, egress or occupancy.
Addition of new roof terrace on new structural framing with raised ceiling height.
Installation of a temporarily construction fence, supported scaffold, sidewalk shed, roof protection and needle beam per plan submitted. Work shall comply with 2022 building codes…
Decommission of existing T-MOBILE site on the roof. No change in use, egress or occupancy.
New slap opening at existing roof.
Remove walk-in freezer and install new walk-in freezer. install condenser on roof. construct chase on floors 2nd through 5th floor.
Filing herewith general construction and structural in Electrical and VFD Control Room improvements (to address new equipment located there and, on the roof above-Main Building). N…
Cycle 9 LL11 Facade and roof repairs as per plans filed herewith. No change to use, egress or occupancy.
Application filed herewith for the installation of a new type i grease exhaust hood in existing commercial space. install hood, grease duct, rooftop utility set exhaust fan and ass…
Decommission of existing T-MOBILE site on the roof. No change in use, egress or occupancy.
General construction for limited exterior facade repairs & limited roof repairs as per plans filed herewith. no change in use, egress or occupancy.
Direct replacement of (1) 2-ton rooftop hvac split-system compressor/condenser unit onto existing steel dunnage