168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Provide new exhaust fans, steam unit cabinet heaters with associated piping, smoke vent for new elevator, split heat pump and relocate existing chemical feed tank in basement.
Mechanical specifications filed in conjunction with gc application #b01031327-i1.
Installation of new mechanical systems including new gas furnace in cellar and attic, air handler in cellar and associated ductwork and piping throughout building. filed in conjunc…
New mini-split system for the basement and second-floor
Exact a/c changeout
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
New ductwork and ac
Hvac equip replace
New ductwork and ac
Installing new hvac systems for new occupancy, including rooftop condenser, furnace, clothes dryer, exhaust fans and ductwork- related to bda-2025-11493
Modifications to the existing HVAC system on the 20th floor (NYC Campaign Finance Board) as per plans. No change to use, egress or occupancy.
ePlan: New mechanical storage building. (185sf)
Re-plaster existing swimming pool (a separate express mechanical permit for new skimmer(s) and a separate express electrical permit for new pool luminaire is required, when applica…
(1) Kitchen and (1) Bathroom remodel for residential buildings (no structural changes) INCLUDING ELECTRICAL, HVAC AND PLUMBING.
Complete work done under previously expired permit #____21010-10000-06847____. Work is ___95___% complete (Minimum 75% percent completed as determined by inspection). INCLUDING ELE…
Add sill plate anchor bolts and plywood to cripple walls (if existing) per LA City Standard Plan #1; no foundation replacement (Earthquake hazard reduction per Chapter 92 of the Lo…
ePlan: New mechanical storage building. (81sf)
Add sill plate anchor bolts, add plywood to cripple walls (if existing), and replace foundation per L.A. City Standard Plan #1 (Earthquake hazard reduction per Chapter 92 of the Lo…
ePlan: Supplemental ref: 13010-30000-03648 to revise floor plan of ALQ to include new mechanical equipment room. No changes to building dimensions.
New 2 story SFR with 4 beds 3.5 baths covered carport and driveway and screen porch on rear deck will be included and a small storage building (200 sq ft) in the back yard. Pool wi…
Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applicatio…