168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Production Resource Group, LLC to erect a temporary stage structure within an existing exhibition building for DATADOG DASH 2026. Scheduled construction to begin on 06/04 and end o…
Installation of a new HVAC system on the 31st floor (Ares- Buildout Phase) as per plans. No change to use, egress or occupancy.
Extend masonry chimney and install new liner. no change to use, occupancy or egress.
Fuel oil tank removal. no change to use, egress or occupancy. work supersedes application 101573806
Installation of new boiler. no change to use, egress or occupancy. work supersedes applications 100843642 & 101573806
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Modification to the existing HVAC system on the 8th floor as per plans (Demolition). No change to use, egress or occupancy.
Minor interior renovation to the first floor commercial store, including the installation of a new mechanical hood, ducts, and exhaust fan as per plan. no change in use, egress, or…
Mechanical specifications filed in conjunction with gc application m01293643-i1
Filing for ac units, the new commercial kitchen exhaust hoods, ductwork, blowers, maxigrill and aqe for commercial kitchen exhaust system and mua system, there is no change in use,…
Structural work to be conducted to install reinforced CMU wall, steel beam and cfs joist with concrete slab on metal deck, and cfs load bearing wall.
Removal and installation of ductwork, diffusers, fans, a/c units and related mechanical piping as per plans. no change in use, occupancy, or egress
ePlan: Commercial Expedited Review - [AE GREEN BUILDING] New Construction of New Apartments Fire Area South.
ePlan: Residential Expedited Review - SITE PLAN APPROVED: PHASE A - Greystar Plan A583 New 2 story attached unit with 2 bedrooms 2.5 bathrooms and a 1 car garage
Replacement of complete existing central heat and air system with or without duct work
New construction of 2-story secondary unit with 2 new driveways.
New 1-story SFR with 3 bedrooms 2 bathrooms attached 2-car garage covered entry porch and patio
Replacement of complete existing central heat and air system with or without duct work
Interior Remodel- minor changes to structural framing updates to electrical plumbing hvac.
New 1-story SFR with 4 bedrooms 3 bathrooms attached 2 car garage covered entry porch and patio
Eastland S352 B Left New - 1 Story SFR w/ 3 bedrooms 2 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.