168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Boiler replacement as per plans filed herewith. no change in use, egress, or occupancy.
Install (4) kitchen hood as per plan. no change in use, egress, or occupancy under this filing.
Installation of new ductwork, air devices, controls to serve existing chilled water fan coil units. Installation of new exhaust fan above tenant restrooms. For Space 0137 - Gap Fac…
Modifications to existing mechanical systems. no change to use, occupancy or egress
BLDG #9_Remove/replace vacuum condensate pump. Provide flue gas/combustion air intake breaching/system, motorized dampers, gas leak detection system; new lighting; louver, equip co…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Modification of existing mechanical system in existing storage building for installation of new boilers as per plan filed herewith. No change in use, egress, and occupancy.
BLDG #6_Remove/replace vacuum condensate pump. Provide flue gas/combustion air intake breaching/system, motorized dampers, gas leak detection system; new lighting; louver, equip co…
Installation of temporary containment netting as per plans. no change in use, egress or occupancy.
Temporary hoist run-back structure during facade replacement, filed separately. run-back structure shall comply with ch #33 of the nyc bldg code. no change in use, occupancy oregre…
BLDG #2_Remove/replace vacuum condensate pump. Provide flue gas/combustion air intake breaching/system, motorized dampers, gas leak detection system; new lighting; louver, equip co…
BLDG #2_Remove/replace vacuum condensate pump. Provide flue gas/combustion air intake breaching/system, motorized dampers, gas leak detection system; new lighting; louver, equip co…
BLDG #3_Remove/replace vacuum condensate pump. Provide flue gas/combustion air intake breaching/system, motorized dampers, gas leak detection system; new lighting; louver, equip co…
Remove existing Vacuum pumps and install new Vacuum and condensate return unit with new zone control valve.
Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applicatio…
Modification of the mechanical system to remove and install equipment and associated ducts and piping as shown on the drawings filed herewith. No change in use, egress, or occupanc…
Subsequent filing for AC condenser replacement in an existing retail space as per the plans filed herewith. No change in use, egress or occupancy.
Mechanical modifications taking place on the 2nd floor as per plans filed herewith. No change in use, egress or occupancy
Installation of ductless mini split system for heating and cooling as per plans filed herewith . no change in use egress or occupancy
Installation of ductless mini split system for heating and cooling as per plans filed herewith . no change in use egress or occupancy
Renovation of existing commercial space on 1st floor and cellar with general construction and mechanical works: new partitions, floor/wall finishes. mechanical work for exhaust hoo…