168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
New construction, addition, GFA change - Addition of a 3-story structure to exiting detach structure for use as religious assembly. Size and location per plans.
New construction, addition, gfa change - for the partial demolition of a structure; size and location as shown on the plan.
New construction, addition, gfa change - for the erection of a second-floor addition above and erection of an open porch to the front of an existing one (1) story semi-detached sin…
New construction - for the erection of an attached structure for use as a single-family household living. sheeting and shoring as prescribed in geotech report. (underpinning not a…
New construction - for the installation of an automatic wet sprinkler system throughout a two-story single-family dwelling to include a one (1) inch combined domestic & fire servic…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
New construction - for the erection of an attached structure for use as a single-family household living. sheeting and shoring as prescribed in geotech report. (underpinning not a…
New construction - installation of an automatic fire suppression system in accordance with nfpa 13r with a fire department connection, backkflow prevention device and 2" service li…
New construction, addition, gfa change - for the erection of a rear addition to include rear walkout deck to an existing attached building. size and location as shown in applicatio…
New construction, addition, gfa change - demolition to the rear part of the first floor of an existing structure. size and location as shown on the plan.
New construction, addition, gfa change - for the erection and expansion of rear side additions on first and second all as part of an existing attached structure. size and location…
New construction, addition, gfa change - for the erection of an attached building to include roof deck and roof deck access structure. size and location as shown in application/pla…
New construction, addition, gfa change - for the erection of solar collector support structure and solar panel system above the existing roof all as part of an existing attached st…
New construction, addition, gfa change - for the erection of an addition at the rear of the existing attached structure with a roof deck above. size and location as shown in the ap…
New construction, addition, GFA change - For the erection of an addition to the rear of an existing structure. Size and location as shown in plans.
New construction, addition, gfa change - for partial demolition of an existing structure and for the erection of an addition on an existing attached structure to inlcude a roof dec…
New construction, addition, gfa change - for the erection of an attached four-story structure (max. 38 ft high) with a roof deck accessed by a roof-deck access structure (stairs an…
New construction - for the erection of an attached three (3) story structure of type v-b construction with basement, roof decks, and roof deck access structures for use as five (5)…
No work - partial occupancy pending completion of bp-2023-0185
New construction, addition, gfa change - for the removal of one (1) accessory interior garage parking space and for the erection of a rear deck on an existing attached structure. s…
New construction, addition, gfa change - for the erection of an attached structure with 8'-0" 3rd story front setback, covered front porch, rear deck, roof deck, and roof deck acce…