168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Infill of an existing elevator opening on the 8th floor framing level and roof elevation for commercial space as per plans.
Installation and use of temporary overhead, roof and mechanical protection as per plans filed herewith. no change to use, egress occupancy under this application.
Herewith filing application for facade replacement and roof repair
Installation of a temporary roof protection , overhead protection and shoring per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress an…
Proposed roof plantings for sustainable roof zone as per LL 92/94 of 2019 in conjunction with the Alt1 as per plans filed herewith. No change to use, egress or occupancy.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Decommission of existing T-MOBILE site on the roof. No change in use, egress or occupancy.
Direct replacement of roof top unit
Install new venting to roof
Installation of material hoist for roofing replacement & rooftop structure renovation. material hoist shall comply with chapter 33 of the 2022 nyc building code. no change in use,…
Installation of suspended scaffold & material hoist for roofing replacement & inspections. suspended scaffold & material hoist shall comply with chapter 33 of the 2022 nyc building…
Installation of suspended scaffold & material hoist for roofing replacement & inspections. suspended scaffold & material hoist shall comply with chapter 33 of the 2022 nyc building…
Installation of material hoist for roofing replacement & rooftop structure renovation. material hoist shall comply with chapter 33 of the 2022 nyc building code. no change in use,…
M533 : GC/ST : Superstructure : Installation of reinforced Concrete Columns, Reinforced Concrete Beams, Slabs, Steel beams, Steel Girders, Joist, Reinforced Concrete Slabs on Metal…
Adding a roof deck to an existing building. Adding interior steps out to roof deck. No change of Use, Occupancy or Egress.
Ps 045k, installation of +/- 316 linear feet of chain link fence, +/- 16 linear feet of sidewalk shed, and 40 square feet scaffold (on the roof) in conjunction with dob # 322054101…
Foundation scope of work in-conjunction with general construction interior and exterior renovation application, with new bulkhead new roof level. no change to use, egress or occupa…
Installation of material hoist for roofing replacement & rooftop structure renovation. material hoist shall comply with chapter 33 of the 2022 nyc building code. no change in use,…
Filing for mechanical work for the direct replacement and in-kind installation of (1) one Roof Top Unit with a similar unit. No change in use, egress, or occupancy.
Ps 129x, installation of +/- 324 linear feet of chain link fence, +/- 13 linear feet of sidewalk shed, and 40 square feet of scaffold (on the roof) in conjunction with dob # 201207…
Installation of suspended scaffold & material hoist for roofing replacement & inspections. suspended scaffold & material hoist shall comply with chapter 33 of the 2022 nyc building…