3,934 permits · Demolition
Make Safe Permit For RP - IN ACCORDANCE WITH CODE BULLETIN PM-1801, A PA PROFESSIONAL ENGINEER IS REQUIRED TO MONITOR REPAIRS MADE UNDER THIS PERMIT. THE ENGINEER MUST SUBMIT A SEALED STATEMENT TO THE...
Interior renovation of existing duplex apartment #16 - 17A. Work to include non-structural demolition, general construction, and finishes. No change in use, egress, or occupancy.
Full demolition of 4 story building using mech means to assist
Existing glass and aluminum dormer structure over walkway to be demolished in entirety. Proposed new awning in place of previous glass dormer. No change in use, egress or occupancy.
Hand demo of a wood frame accessory structure
Terrace demolition
Existing glass and aluminum dormer structure over walkway to be demolished in entirety. Proposed new awning in place of previous glass dormer. No change in use, egress or occupancy.
City Funded Demolition 1. Remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing from lot. 2. Contract term 60 days from award date. 3. ACHD asbestos applic...
City Funded Demolition 1. Remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing from lot. 2. Contract term 60 days from award date. 3. ACHD asbestos applic...
Full demolition to a three story house
Full demolition to a two story building
Demolish and repair collapsed block east wall and repair north and south block wall. no change on use, egress or occupancy under this application.
temporary construction fence filed in conjunction with demolition permit application 322041087
Interior non-structural demolition, new partitions, casework, and finishes.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 1st thru 5th floors (Harry Winston) as per plans. No change to use, egress or occupancy.
City Funded Demolition 1. Remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing from lot. 2. Contract term 60 days from award date. 3. ACHD asbestos applic...
1. Remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing from lot. 2. Contract term 60 days from award date. 3. ACHD asbestos application required - Survey...
Hand demo of a wood frame accessory structure
Hand demo of a steel metal frame accessory structure
Interior alterations to include non-load bearing demolition. no change to use, occupancy or egress
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com