952 permits · ADU
NEW 2-STORY (43' X 21') ACCESSORY BUILDING WITH 2 ACCESSORY DWELLING UNITS PER GC 66323(a)(4) . NFPA 13D FIRE SPRINKLERS THROUGHOUT.
NEW 2-STORY (95'-2" X 21') DUPLEX PER SB9 TWO-UNIT DEVELOPMENT CA GOVT. CODE 65852.21WITH ATTACHED GARAGE AND ACCESSORY DWELLING UNIT PER LAMC 12.22 A.33 (c) AND (e). NFPA 13D FIRE SPRINKLERS THROUGHO...
NEW 2-STORY (110'-10" X 41'-6") DUPLEX PER SB9 TWO-UNIT DEVELOPMENT CA GOVT. CODE 65852.21 WITH ATTACHED GARAGE AND ACCESSORY DWELLING UNIT PER LAMC 12.22 A.33 (c) AND (e). NFPA 13D FIRE SPRINKLERS TH...
New 2-STORY detached ADU duplex
*EPLAN* NEW 2-STORY DETACHED ADU PER LAMC 12.22 A.33(b)(1). TO BE SPRINKLERED THROUGHOUT WITH NFPA-13D SPRINKLERS.
NEW DET 25' x 42' TWO-STORY 2 ACCESSORY DWELLING UNITS; NFPA-13D THRU-OUT
Construct (2) new 2-story w/ basement detached ADUs per State ADU Ordinance w/ attached carport/patio (Government Code 66323(a)(4)). NFPA 13D FIRE SPRINKLERS REQUIRED THROUGHOUT.
NEW 2-STORY (42'-2" X 21') ACCESSORY BUILDING WITH 2 ACCESSORY DWELLING UNITS PER GC 66323(a)(4) . NFPA 13D FIRE SPRINKLERS THROUGHOUT.
NEW 2-STORY 2-UNITS ACCESSORY DWELLING UNITS PER GC 66323(a)(4) WITH ATTACHED STORAGE AND AWNING
New detached accessory dwelling unit per gcs 66323(a)(2)
New 3-story duplex with attached 1-story adu per state law at rear of lot***13d sprinkler***2 of 2
General-Expedite-Building Construction:3022/Martin - SOUTHEASTERN SAN DIEGO: Combination Building Permit for proposed new detached 2-story building containing (2) ADUs at a lot with an existing SDU.
General-Expedite-Building Construction:1932/Imperial - Scope change 10/21/2025 SOUTHEASTERN SAN DIEGO; Combination building permit for new detached 2 story ADU Duplex with 3rd floor deck to an existin...
Non-DCE-Standard- Standalone:4972/Tierra Baja - COLLEGE AREA: Right-of-Way permit for enclosing the driveway to a lot with an (E) SDU and new ADU building development. Scope includes to replace sidewa...
Non-DCE-Standard- Standalone:4236/Cleveland - UPTOWN; Right-of-Way permit for proposed public improvements associated with an existing SDU and new ADU construction. Work to include a new copper water...
General-Expedite-Building Construction:1932/Imperial - Scope change 10/21/2025 SOUTHEASTERN SAN DIEGO; Combination building permit for new detached 2 story ADU Duplex with 3rd floor deck to an existin...
Removal and recompaction for new duplex and single family dwelling w/attached adu
NEW 2-STORY (52' X 40') SINGLE FAMILY DWELLING WITH ATTACHED GARAGE AND ACCESSORY DWELLING UNIT PER LAMC 12.22 A.33 (c) AND (e). NFPA 13D FIRE SPRINKLERS THROUGHOUT.
2025 WILDFIRE REBUILD,DETACHED GERAGE CONVERSION TO AN ACCESSORY DWELLING UNIT PER GC 66323(a)(2), 1-STORY, 18'0"x18'0". NFPA 13-D SPRINKLERS THROUGHOUT, EO1
Eplan. NEW 3 STORY DUPLEX WITH ATTACH ADU (715 SQ FT) PER PER GCS 65852.2(e)(1)(D) AND LAMC 12.22 A.33(c)(d) AND (g) WITH TWO CAR CARPORT