Search Building Permits
2,835 permits · HVAC · NY
Perform selective removal work, provide new HVAC equip & assoc ductwork, piping, controls, accessories, etc. Protect & reuse existing equipment as shown on plans. Application filed in conjunction with...
Proposed installation of new central air conditioning and heating system throughout apartment, including air handlers, duct work and condensers; installation of exhaust fans. No change to use. occupan...
installation of new mechanical supporting equipment, duct and piping for 3 new boilers to be installed as per plans.
New Mechanical Systems including HVAC System for 5 - Story NB with Industrial Use.
Replace existing air handling units, exhaust fans, return fan, VAV boxes, unit ventilators and fan coil units . Balance airflows in existing classrooms to match existing design CFM. Replace existing H...
NYCHA BOILER_BLDG#9_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
Air conditioning unit replacement for the IT Room on the 31st floor. No change in use egress and occupancy.
Relocate existing bathroom fixtures on the first floor, relocate fixtures on the second floor and replace boiler and hot water heater with new combi-boiler on the first floor.
Install new central air condition system at existing 1-story building.
Subsequent filing plumbing work to install kitchen, bathroom, & boiler room. no change in use, egress, or occupancy.
Install new central air condition system at existing 1-story building.
Air conditioning unit replacement for the IT Room on the 31st floor. No change in use egress and occupancy.
Relocate existing bathroom fixtures on the first floor, relocate fixtures on the second floor and replace boiler and hot water heater with new combi-boiler on the first floor.
Installation of hvac and ventilation equipment as per the plans. no change to zoning, use, egress, or occupancy under this application.
Refurbishing existing retail store at 1st floor as per plan including mechanical works to install ventilation system for manicure and pedicure stations and new installation of hvac and duct works.no c...
Subsequent filing plumbing work to install kitchen, bathroom, & boiler room. no change in use, egress, or occupancy.
Install hvac systems for existing building. no change to use, egress or occupancy.
installation of new mechanical supporting equipment, duct and piping for 3 new boilers to be installed as per plans.
Replace existing air handling units, exhaust fans, return fan, VAV boxes, unit ventilators and fan coil units . Balance airflows in existing classrooms to match existing design CFM. Replace existing H...
New Mechanical Systems including HVAC System for 5 - Story NB with Industrial Use.