Search Building Permits
10,167 permits · Plumbing · NY
Pl application filed herewith to perform plumbing roughing as indicated on drawings in conjunction with altco application m01340670, cap/remove existing plumbing piping and fixtures, remove excess deb...
Fixture removals and Legalization in conjunction with GC application.
Plumbing modifications taking place in the cellar as per drawings filed herewith. no change in use, egress or occupancy.
partial plumbing work, new building main sewer line as per DEP approved site connection. DOB inspection for sewer line steel sleeve through foundation wall.
Perform plumbing modification work and install sprinkler system inconjunction with building conversion from three (3) to two (2) family dwelling. remove gas fixtures and piping. relocate & install plu...
Plumbing in conjuction with new building job number # b00872449-i1
Modification of plumbing system as shown on plans.
Modification to existing Sprinkler system and plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application.
Installation of new storm piping, water/sanitary work subsequent filing to general construction (gc) filing.
provide new sanitary facilities for office in conjunction with Alt #M01355130 as per plans filed
provide pantry sink and HWH for office in conjunction with Alt #M01367407 as per plans filed
provide new sanitary facilities for office in conjunction with Alt #M01355130 as per plans filed
Plumbing specifications filed in conjunction with gc application x01257342-i1
Plumbing specifications filed in conjunction with bis application 340803045
Plumbing work-type filed in-conjunction with alt-co job#: q01308060.
Filing herewith plumbing drawings for renovations in Apartment 3i. No change in Use, Egress or Occupancy under this application.
Interior non structural alteration. Removal of interior partitions, doors, cut and cap plumbing fixtures.
Plumbing work is proposed in existing unit #2 on the 2nd floor. Subsequent GC, MH, SP, and exterior applications will be filed. All per submitted plans. No changes to use, egress, or occupancy under t...
Disconnect and removal of existing plumbing fixtures at various locations. Furnish and install new plumbing fixtures and associated piping at various locations.
Plumbing work filed in conjunction with renovation of 5-story nycha multiple dwelling as part of the nycha pact renovation: installation of new sanitary, storm, domestic water, sanitary vent and gas p...