Search Building Permits
5,430 permits · Roofing · NY
Rooftop solar installation. no change to use, occupancy or egress.
Installation of mechanical duct work in commercial spaces on first and second floors and new roof top mechanical units on existing steel dunnage using existing rooftop penetrations. No change in occup...
Filing for tenant-in-place window and roof replacement, and storefront repair/replacement to meet ADA requirement. No change in egress, zoning, use, or occupancy.
Renovation of existing eating and drinking establishment at first floor. Work include install new mechanical units with dunnage at roof. No change in use, egress or certificate of occupancy.
Installation of solar panels on existing roof. no change in use, occupancy, or egress. no change in bulk
Kohne hall - facade restoration including localized brick and brownstone masonry repairs, minor roof maintenance, stained and leaded-glass window restoration. no change in use, egress or occupancy.
Edson hall - facade restoration including localized brick and brownstone masonry repairs, minor roof maintenance, stained and leaded-glass window restoration. no change in use, egress or occupancy.
Installation of 4.86 kw solar energy system on roof. No change of occupancy, use or egress.
To file ms worktype for a new split unit at the 3rd floor roof and 1st fl. retail. no change in use, egress, or occupancy under this application.
General construction on the cellar, 1st to 4th floor and roof as plans filed herewith. no change in use, egress, or occupancy.
Remove and replace gravity exhaust /re-install roof ventilators and exhaust fans. Remove and replace louvers.
Exterior facade repairs and waterproofing, brick replacement, lintel/spandrel repairs, sill repairs, pointing. No change in use egress or occupancy
Facade repairs and roof replacement. No change in egress, use or occupancy.
QC, Steam Tunnel Structural Repairs per plans: Removal & replacement of existing waterproofing membrane, flashings. Repair of spalled concrete & cracks and deteriorated reinforcement of tunnel ceiling...
Installation of solar panels, rooftop, grid tied, railed, 18 modules, 7.38 KW
installation of solar panels, rooftop, railed, grid-tied, 11 modules, 4.51 KW
installation of solar panels, rooftop, railed, grid-tied, 23 modules, 9.43 kw
Installation of solar panels on existing roof structure. no change in egress,use, or occupancy.
Mechanical work to renovate units #1b, 1d, 2a, 2b, 2c, 2d,3a, 3b, 3c & 3d from cellar to roof, no change to use, egress or occupancy.
T-Mobile : Removal & install cabinets on existing platform on roof. Replace & install antennas. Remove and install RRH on roof. All in compliance with TPPN 5/98. No change in use, egress or occupancy.