3,954 permits · Demolition
Demolish existing two-family dwelling and detached accessory garage per plan.
Demolition of interior partitions, finishes & fixtures + the installation of new partitions, finishes & fixtures. work includes obtaining a new c. of o. for a single-family dwelling. interior renovati...
Full demolition to a four story building
Demolish ex detached pool house dressing room per dept's information bulletin, p/bc 2023-039.
Mechanical means submitted for use of mechanical equipment on grade at the time of demolition
Demolition of metal stair from 39th to 40th floor. Infill of existing slab openings on 40th floor with new slab construction supported by steel beams. (Area of work approx. 300 square feet. No change...
Interior Non-Structural Demolition Elevator Lobby in 3rd Floor
Total Demo of SFR 1657 sqft circa 1964
Total Demo of SFR 2474 sqft circa 1957
Total demo of SFR 1783 sqft circa 1956
Interior Non-Structural Demolition
Demolition of detached garage and recreation room
Demolish (e) garage
The mechanical scope of work submitted under this application entails demolition of existing mep services. the systems include ductwork and distribution.
Eplan: 1. existing detached storage to be demolished.2. existing detached 1-car garage to be demolished.
Herewith filing for interior soft demolition on the 49th (marketing flr 50) and 50th (marketing flr 51) per plans. no change in use, occupancy or egress under this application.
Preparation Work for Full Demolition - Interior Demo
Total Demo of SFR 1980 sqft circa 1979
Interior demolition. removal of non-load bearing walls. no change in use egress or occupancy under this application
Interior renovation to Apt#W12C. Minor demolition and construction of partitions and finishes. All as per plans submitted herewith. No change in use, egress or occupancy.
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com