Search Building Permits
414 permits · Electrical · CA
7th floor: mechanical and electrical work for t.i. ref arch #202511200104
demo and dispose existing old pole lights & wirings. install new ballard lights inside lawn area near existing. install new ballard lights in other areas of the lawn.
tenant fitout of existing showroom in pre-engineered warehouse. scope includes new offices, showroom. structural, mechanical, electrical, and plumbing work. exterior modification to (e) storefront inc...
24th fl suite 2450a: minor demolition of non structural elements including partitions, finishes, ceilings & lighting. construction of new office fronts and doors, same lobby, vestibule and lighting. i...
remodel bathroom, new cabinets, counters, tile shower pan, same locations, new fixtures and finishes, plumbing and electrical, insulation and sheetrock
powder room replace toilet, sink, tile to bring up to code. electrical and plumbing in kind. master bathroom: replace toilet, sink, tub to bring up to code. elect. and plumbing in kind.
change of use from retail to tea coffee shop (limited restaurant). add sinks and bar area to current retail space. install 3 compartment sinks, hand sink, mop sink, prep sink. upgrade hot water heater...
removing 3' wide of upper and lower cabinets and doing rough plumbing & electrical for new washer dryer location. install new counter top in that location
install 5 additional exterior light fixtures. connect to existing circuit enclose the meter/panel to protect electrical panel
electrical power upgrade, converting to 3-phase
comply to nov 2025-35932 (e) original 2/f rear yard extension and exterior stairs were fully enclosed and converted into a 2-story extension of approx 13'x12'-6", including internal staircase. new ele...
**ePlan**LAX**Supplemental to permit # 24020-10000-01169 to revise plan : pad sizes, changed due to the larger electrical pull box procured.
ePlan: Supplemental to permit #25014-10000-05118 to revise dimensions on floor plan, relocate electrical panel, and revise foundation plan. No change in plot plan.
installation of new fuel cell equipment with associated structural platform support, plumbing and electrical engineering. all exterior work and no modificationsto existing building or use impacted. lo...
unit 714: remove closet & adjoining non weight bearing walls, header above closet will remain & moved approx 3" higher to match adjoining dropped ceiling. no plumbing & electrical work is required
unit 3-kitchen remodel: demo no load bearing wall, replace cabinets, new plumbing and electrical fixtures.
unit# 12: kitchen & bathroom remodel like for like, replacement of two windows in-kind one in bathroom one in kitchen , new electrical upgrade and a new panel, replace dishwasher and applicance.
remove (e) kitchen cabinets & install new cabinets in same location. like for like. reconnect (e) plumbing to sink & dishwasher. no changes to layout, walls, electrical or structural components. all w...
conduit line installation wiring of shed, prefab shed build approx 120sqft or less, main water valve replacement.
fire damaged repair to studio unit t-704 only. scope of work includes interior & exterior finishes windows, doors, applliances, electrical, all like for like