Search Building Permits
2,835 permits · HVAC · NY
Filing to remove existing peerless oil-fired boiler model# ect-e-04-175su with dob id# 62841 and also remove ex oil tank located at cellar fl. work as per plans.
Register existing boiler per ecb violation # 32067966n installed per laa 310345846
Proposed installation of new central air conditioning and heating system throughout apartment, including air handlers, duct work and condensers; installation of exhaust fans. No change to use. occupan...
Perform selective removal work, provide new HVAC equip & assoc ductwork, piping, controls, accessories, etc. Protect & reuse existing equipment as shown on plans. Application filed in conjunction with...
Renovation of cellar mechanical equipment room - nycha boilers
Combine two stores & obtain new certificate of occupancy. Interior renovation of existing stores to deli store. Install partition walls, finishing floor, walls & ceiling. Install kitchen exhaust syste...
Install new HVAC units for Chase Bank.
Replacement of air conditioning units in apartment apt. 9b, 9th floor residence with minor mechancial work as per plans filed herewith. no change in use,egress or occupancy
Ex. VRF multi-split heat recovery system to be used for air conditioning dining, service and prep area. Ex. ceiling exhaust fans for restroom to remain. Ex. ERV to be reused for outside air requiremen...
Installation of mechanical HVAC system, ventilation duct work. Mechanical scope only.
Filing for pad extension related to boiler replacement/removal per plans filed. no change to use, egress or occupancy.
Replacement of HVAC equipment (Vacuum pump, condensate pump)
Interior renovation of cellar, 1st & 2nd floor of existing 2 story building. demolition work and construction work as per plan. install new hvac, partition, flooring, ceiling and painting throughout....
Remove incinerator and cap existing flue. Install new flue lining in chimney. Remove existing thermostats throughout building and replace with new. Remove and replace ductwork, oil piping, vent piping...
Modifications to hvac system for tenant fitout (suite 15 - csc store# 24076 / wtz store# s-906) as per plans filed herewith. no change in use, egress or occupancy under this application.
Modifications to the existing HVAC system on the 12th floor as per plans. No change to use, egress or occupancy.
Install new hvac as plan. no change in egress, use, or occupancy.
Install new gas-fired boiler for domestic hot water in cellar.
Install new gas piping and new meter for two gas-fired boilers ,and install hot water storage tank in cellar.
Install replacement boiler/burner unit as per plans. no change to use, occupancy or egress.