Search Building Permits
5,430 permits · Roofing · NY
Proposed partial demolition of non-conforming 2nd floor addition to exist. one-story garage to have ECB violation# 39108785R resolved. New roof to be installed to the previously exist. 1 story garage...
General Construction and Structural work to repair and replace damaged roof joists & repair existing roofing at the garage only to rectify ECB Violation #39158828N No change in use, egress or Occupanc...
herewith filing for general construction modifications to the roof B Midwood - Mount Sinai. No change in use, egress, or occupancy.
Sprinkler system alterations on the 1st thru 3rd floors, cellar, mezzanine, and roof levels in conjunction with full building renovation; related work as per plans.
Lorillard hall - facade restoration including localized brick and brownstone masonry repairs, minor roof maintenance, stained and leaded-glass window restoration. no change in use, egress or occupancy...
Miscellaneous facade and roof repairs as per plans. no change in use, egress or occupancy.
Miscellaneous facade and roof repairs as per plans. no change in use, egress or occupancy.
Miscellaneous facade and roof restoration as per plans. no change in use, egress or occupancy.
Miscellaneous facade and roof restoration as per plans. no change in use, egress or occupancy.
Installation of outrigger beams (needle beams) to support scaffold & roof protection as shown on drawings. no change in use, egress or occupancy. we shall comply with chapter 33 of 2022 b.c
MISCELLANEOUS FACADE & ROOF RESTORATION (floors 1-6), AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Remove and replace existing HVAC system from basement through roof as per plans. No change in use, egress, or occupancy.
Alteration co (type i) for change of use on the 7th floor and updated certificate of occupancy to reflect floors 1-9 and roof. this is general construction for alt i bis# 123907512.
Installation of a temporary roof protection as per plans during new building construction. no change in use, egress or occupancy. roof protection to comply with 2022 nyc building code, chapter 33.
Installation of temporary roof protection as per plans. no change in use, egress or occupancy.
Installation of PV system on existing roof, no change to egress or use of occupancy
Installation of photovoltaic solar array on existing roof system as per plans
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Installation of solar panels, rooftop, railed, grid-tied, 11 modules, 4.785kw
Installation of solar panels, rooftop, railed, grid-tied, 10 modules, 4.35kw