Search Building Permits
2,061 permits · Demolition · NY
demolition of a 2 family house
Partial demolition means & methods for portions of 2nd floor, mezzanine, 1st floor, escalator removal as per plans. this application is filed in conjunction with m01277980-s5.
Construction fence for demolition of existing structure and erection of a new residential building
Propose interior partition and finish demolition work at the cellar and 1st floor commercial space as per plan. No change in use egress, or occupancy.
Demolition of the existing interior build out and core toilets as shown on drawings. No change in use, egress or occupancy.
Minor interior renovation to apartment unit 1d,3c. partial non-structural demolition. installation of new partitions, lighting and finishes. no change to use, egress or occupancy. no work to windows a...
Interior demolition of non load bearing partitions on the 21st floor (SW corner, former EyeBio) as indicated on drawings
Full demolition
First phase preparatory interior demolition of non bearing walls. No work to VCT or Mastic.
Interior demolition of existing non-bearing gyp. bd. partitions. Installation of new non-bearing partitions, door, frames and finishes. No change in use, occupancy or egress
Interior renovations to existing apt. #11G. Work to include non-structural demolition, general construction and finishes, as per plans filed herewith. No change in use, egress or occupancy.
Interior alteration related to the combination of two existing apartments #ph19 and #ph20-21, including demolition & general construction work. No change to use, occupancy or egress
Structural modifications including but not limited to slab removals for pits and doors, demolition of catwalk beams and bracing beams, shear wall openings, framing, new openings for pits, new steel be...
Demolition of the garage
Interior renovation to apartment unit 3c. partial non-structural demolition. installation of new partitions, lighting and finishes. no change to use, egress or occupancy. no work to windows and faade
Interior alteration related to the combination of two existing apartments #ph19 and #ph20-21, including demolition & general construction work. No change to use, occupancy or egress
Interior renovations to existing apt. #11G. Work to include non-structural demolition, general construction and finishes, as per plans filed herewith. No change in use, egress or occupancy.
Application filed for temporary construction fence for demolition of structure on property
Full demolition
Demolition of the existing interior build out and core toilets as shown on drawings. No change in use, egress or occupancy.