Search Building Permits
414 permits · Electrical · CA
ebiko sushi- 217 montgomery st, small take out food establishment, tenant improvement, new fixtures, finshes, equipment, lighting, plimbing and electrical work. no exterior changes.
EPLAN- Supplemental to 24014-10000-05098 to add new wet/bar sink in existing bedroom and New electrical GFCI outlet, TR for wine cooler;
Bathroom remodel for residential buildings (no structural changes). ELECTRICAL AND PLUMBING INCLUDED"COMPLY WITH DEPARTMENT ORDER effective date 11/08/2024. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DA...
replace drywall after electrical rewire in (e) walls. no structural changes layout or use. patch of small holes not entire walls.
remove and replace 3 bathrooms in-kind. replace 2 dry rot damaged sliding rear doors. update electrical and plumbing in kitchen and bathroom. replace non-functioning can lights. no work to facade. no...
studio a- bring (e) stair case to mezzaine to code extending mezz area, remodel bathroom, add mens/womens, (n) electrical lighting, new wood floors and carpet, paint, (n) a/c unit
studio b - bring (e) stair case to mezzanine to code extending mezz area, remodel bathroom, (n) electrical lighting, new wood floors and carpet, paint, (n) a/c unit
studio c- bring (e) stair case to meszzaine to code extending mezz area, remodel bathroom, (n) electrical lighting, new wood floors and carpet, paint, (n) a/c unit
remodel existing galley kitchen 7'including electrical and plumbing updates.
legalization of illegal unit as approved under #2017-011948prj, remodel of kitchen and bathroom at new adu, unit 3. replace wood stairs at rear of building. upgrade electrical panel for adu to 100amp...
8th fl ref pa #2026-0121-4206: revised mechanical & electrical for new offices created on floor. new ducts, heating & air.
ground fl: new security turnstiles to lobby of existing hi-rise downtown building. work to include new partitions (electrical deferred)
kitchen remodel, new cabinets, no electrical no plumbing to be changed.
repaint dining area wall and ceiling. replace dining floor tiles. (no plumbing and electrical).
remodel master bedroom, master bathroom & closet. new electrical, new plumbing, new insulation, sheetrock, plumbing.
unit 3: bathroom remodel, tub to shower conversion. in kind except new shower in location of existing tub. electrical and plumbing to be updated. replace (e) kitchen hood.
unit 5: remodelkitchen in kind. remodel bathroom in kind. upgrade electrical throughout the apartment. new insulation, sheetrock, painting & flooring throughout the apartment. no wall alteration.
in kind kitchen remodel and in kind 2 bathroom remodels like for like, upgrade plumbing and electrical. kitchen approx. 90 sq ft. each bathroom approx. 30 sq ft.
minor ti of (e) space at ground floor. (n) bathroom at (e) plumbing. (n) non structural walls, counter, and cabinets. new lighting (electrical). establish general retail use. demising one tenant space...
unit 102 & 203: kitchen & bath remodel, relocate fixtures, add dishwasher, electrical up to grade & add washer dryer