Search Building Permits
2,835 permits · HVAC · NY
Spear - modification of hvac.
Jacobi Medical Center proposed Mechanical-HVAC work interior renovation of an MRI on 3rd and 4th Floor. No change in use, egress or occupancy. All as per plans filed herewith.
General renovation of 3-family house with replace/relocated/new plumbing fixtures and boiler and h.w.h as per plan. no change in use, egress or occupancy.
Install one (1) new gas-fired high pressure boiler as per plans. no change in use, egress or occupancy.
Tenant fit out: Installation of air conditioning units. No change in use, occupancy or egress.
Boiler replacement and associated ducts and piping work as per plans filed herewith. no change in use, egress, or occupancy.
Installation of hvac equipment, ductwork, and piping for apartment renovation. no change in use, egress or occupancy.
Provide concrete pads for mechanical and plumbing equipment, openings and reinforcement for boiler rigging and ventilation.
Filing herewith modification of hvac system as indicated on the drawings.. no change in use egress or occupancy.
Nycha east river boilers consisting of plumbing work in the cellar as per plans filed herewith. no change to use, egress, or occupancy.
R041, installation of temporary chimney, steam and condensate pipings and connect temporary emergency mobile boiler trailer to provide heat during heating season. no change in use, egress or occupancy...
NYCHA BOILER - Plumbing work and associated piping for interior renovation.
Modifications to existing HVAC System as per plans filed herewith. No change in use, egress, or occupancy.
Hvac modifications for 9th floor commercial space.
Installation of hvac system as per plans filed herewith in conjunction with nb #220607332.
Install new gas-fired steam boiler for heating in cellar.
Modifications to the existing HVAC system on the 8th floor (HITT - Office Buildout) as per plans. No change to use, egress or occupancy
Filed herewith for mechanical work, including modifications to existing hvac ductwork, new walk-in box condenser and evaporator units, and new kitchen hood with associated ductwork. no change to use,...
Filed herewith for mechanical work, including modifications to existing hvac ductwork, new walk-in box condenser and evaporator units, and new kitchen hood with associated ductwork. no change to use,...
General renovation of 3-family house with replace/relocated/new plumbing fixtures and boiler and h.w.h as per plan. no change in use, egress or occupancy.