168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
FILING TO INSTALL OUTRIGGER ON THE ROOF FOR FACADE WORK. No change in use, occupancy or egress under this application.
Repair of front and rear facades, repair work on roof, no change in use, occupancy, or egress. No work in the interior.
Replacing roof, Masonry, and windows in kind. waterproofing existing structure.
Removal of existing asphalt roof shingles and replace with new at steep roofs. Removal of IRMA roofing and installation of SBS built-up roofing. Interior repairs and painting.
Interior renovation of existing commercail space on 1st floor and roof. no change in use, occupancy and egress. existing sprinkler system to remain. fire suppression system will be…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Installation of 300 psf sidewalk shed and roof protection as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under th…
Facade repairs to include masonry, pointing, sills, lintels, concrete patching, balcony roof repairs, and parapet coping
Temporary bulkhead enclosure and temporary roofing for the final building repairs.. there is no change, in use, egress or occupancy.
Application filed herewith for interior renovation at cellar, first, second andattic floor with replacement facade, windows and roof of existing 2 1/2 two and a halfstory with cell…
Installation of new non-emergency gas generator on the roof. No change in use, egress or occupancy.
Respectfully request to install new A/C condensers @ roof with associated refrigeration lines @ Apt 3F. No change use, egress, or occupancy.
Early work removals - Floor 1-5 and roof - Removal of all sprinkler/standpipe components. Cellar level - removal of all sprinkler/standpipe components except EXIST. 6 DCDA AND EXIS…
Renovation of existing house of worship, int & ext demo, general construction. removal & replacement of existing facade including ornamental tower/spire, existing arcade & exterior…
Reframing and reinforcement of roof joists for new skylight opening. no changes to egress or occupancy under this application
General construction for limited exterior facade & roof repairs as per plans filed herewith. no change in use, egress or occupancy.
Installation of new false roof dormers.
Filing for roof repair. No change to use, egress or occupancy.
Install new roof top equipment and associated duct work and mechanical equipments
Installation of roof protection as per plans. protection shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Proposed roof renovation and bulkhead replacement as per plans submitted herewith. there is no change in use, egress or occupancy.