168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Full demolition of a 1-story building.
Minor interior demolition. Install new interior drywall partitions, doors, suspended ceilings, flooring and finishes on the 1st Floor as per plans (Harbor Picture Co.) No change to…
Full Demolition as per plans filed herewith.
Full hand demolition of single car masonry garage
Installation of structural work involved in partial demolition as per the plans filed herewith. no change in use, occupancy or egress.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Full Demolition to One Story Structure
Full demolition of the existing 2-story building.
Structural work including framing for miscellaneous walls and openings for new fuel oil risers and fuel oil fill box, and partial demolition and re-framing at 15th floor dunnage fo…
Partial demolition on existing four(4) family,three(3) story frame residential building with basement and cellar.no change of building bulk,occupancy or egress.
Demolition/construction of the 14a floor interior in 200 central park south no change of use, egress or occupancy.
installation of construction fence to protect site during full demolition
The proposed demolition is for 2 story masonry garage attached to another garage located within our property that is not attached to residential building. It's not attached to the…
Full demolition to a two story building
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 17th floor (Heyman Buildout). No change to use, egress or occupancy.
Full demolition of a 3-story + cellar frame building.
Interior non-structural demolition of walls, ceilings, and flooring as shown on the plans.
Interior demolition of non load bearing partitions on the 11th floor as indicated on drawings.
Herewith filing soft-demolition in conjunction with future tenant fit-out per plans. no change in use, occupancy or egress under this application.
Temporary Structural Bracing and Partial Demolition during Facade repairs. No Change in use, Egress or Occupancy.
Partial structural demolition of building interior as shown per plan.