168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
BLDG #3_Remove/replace vacuum condensate pump. Provide flue gas/combustion air intake breaching/system, motorized dampers, gas leak detection system; new lighting; louver, equip co…
full demolition of one story structure, using mechanical means to assist
Herewith filing mechanical work as per plans in conjunction with alt1 application. paa filed to remedy code violations and design flaws in previous applicant, applicant of record h…
Herewith filing for related mechanical work as per the drawings. No change in use, egress or occupancy.
Installation and use of temporary knuckleboom as per plans filed herewith. no change in use, egress, or occupancy.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Mechanical work proposed for an existing residential apartment. No change of use, occupancy or egress,
BLDG #4_Remove/replace vacuum condensate pump. Provide flue gas/combustion air intake breaching/system, motorized dampers, gas leak detection system; new lighting; louver, equip co…
Installation & replacement of new condenser and indoorhvac units on the 5th floor. no change in use, egress oroccupancy.
Hvac duct modifications for existing ground floor commercial space as per plans filed herewith.
Renovation of exist. store with, repair/new partition, floor, ceiling, door, painting, split type a/c as per plan. no change in use, egress or occupancy.
Install new hvac system for the 4-story building subsequent with dob job#b01335160, no change in use, egress and occupancy.
Installation of new HVAC split systems.
Mechanical work filed in conjunction with general construction dobnow job #m01377085-i1. no change in use, egress, or occupancy.
Full hand demolition of a 1 story frame garage using handheld devices. foundation to be removed using mechanical means
Full demolition of a 2.5 story building. using hand held equipment and mechanical means to remove foundations, load out debris and back-fill.
Extend chimney as per plan - no change in use, egress or occupancy under this application.
Application for the installation and use of mini-crane as per plans filed herein. No change in egress, use, or occupancy.
Removal of existing ductwork, diffusers, fans, and related mechanical piping, as per plans. no change to use, egress or occupancy.
2 split type heat pump and air conditioning system in rear of building. no change in use, egress or certificate of occupancy under this application.
Sprinkler piping and sprinkler heads layout to be updated per new architectural and mechanical layout. no change to use, egress or occupancy.