168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Conversion of the existing one story one-family building into a two story two family building as shown on the plans. proposed vertical & horizontal enlargement. interior renovation…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Interior alteration of first-floor dwelling units to 4 dwelling. install new partitions, doors, kitchens, bathrooms and related finishes. amend certificate of occupancy. no change…
Work to include new partitions, acoustic ceilings, materials, fixtures, finishes & equipment throughout. work on 2nd floor interiors only.
Nyu sunset park primary care & rehab practices - interior buildout as per plans filed herewith in conjunction with new building application b08029487-i1. no change in use, egress o…
Filing to install new door with stairs and canopy at rear exp #3. address ecb vio #: 39178082y. no change in use, egress or occupancy.
Existing school Building K495, CTF Room Conversion of existing Weight Room/Exercise Gym #185G into a new Multi-purpose Fitness Room
Interior renovation floors 1 and 2. New windows 3rd floor only.
Proposed earthwork, foundation and structural system for a new building.
Proposed earthwork, foundation and structural system for a new building.
File plumbing wokr for nb job.
Earthwork / Piles, Piles cap and Grade Beam and concrete slab foundation for New Building.
(dev hub consultation completed for this application , please assign to dev hub) proposing new 7 story residential building.
Proposed earthwork, foundation and structural system for a new building.
Convert existing (5) five dwelling units into (1) one dwelling unit in existing 3-story building w/basement. interior renovation at each level. obtain new certificate of occupancy.
Temporary roof / overhead protection at the adjoining properties during nb const filed sep. roof / overhead protection shall comply with ch #33 of the nyc bc. no change in use, occ…
Proposed earthwork, foundation and structural system for a new building.