168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
(ePLAN) NDC-6349 - Phase 2 - Non-Ductile Concrete Retrofit to 1959 Booth Hall Building ONLY (Music Building Addition) with exterior and interior tenant improvement.See Comments
Early start demo removal of interior non load bearing partitions, ceilings, plumbing , electrical and mechanical systems. excluding fire sprinklers and fire life safety systems. fu…
12 window(s). Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is requir…
remodel kitchen and bath. relocate kitchen and bedroom. electrical,plumbing upgrde throughout. remove e plaster and replace w drywall. install insulation oif e walls and ceilings t…
revision to pa #202305026865-s2. revision to miscellaneous in field changed items to previous approved addendum 2 mechanical, electrical and plumbing drawings.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
add commercial counter tops and appliances for hoodless coffee shop. add mechanical hvac. add plumbing; remove 2 3" wide section of non-structural wall.
convert 377sf (e) garage to conditioned space, home office, wet bar, full bathroom, and rec. room (infill ). relocate (e) laundry room, furnace, and water heater.
2nd and 3rd/fl- interior soft demo of non loading bearing and non shearing wall, door, ceiling, flooring, mechanical , plumbing and electrical utilities inside the suite.
change of use from retail to spa. remove partition and soffit. construct new walls. provide new sliding barn doors. provide water heater, washer dryer and service sink. new cabinet…
Replace existing pre-fabricated fireplace with the same size and in the same location. Installation shall be as per manufacturers recommendations. A HVAC permit is required.
Add sill plate anchor bolts and plywood to cripple walls (if existing) per LA City Standard Plan #1; no foundation replacement (Earthquake hazard reduction per Chapter 92 of the Lo…
Add sill plate anchor bolts and plywood to cripple walls (if existing) per LA City Standard Plan #1; nofoundation replacement (Earthquake hazard reduction per Chapter 92 of the Los…
Bathroom remodel for residential buildings ( no structural changes mechanical, electrical, and plumbing included
Early start demo for the removal of interior non load bearing partitions, ceilings, plumbing, electrical, and mechanical ststems, but not including fire sprinklers or other fire sa…
modification of retail market & food facility (health requirements; expand & enclose live chicken slaughtering area; create live chicken caged area; install trough drains in live c…
ref. 202601224294, mechanical-rework of low side air distribution.
like for like remodel of (2) existing bathrooms including new electrical, plumbing, and mechanical. installation of new fixtures and finishes, tile work, drywall repairs and paint.
1. conversion of (e) ground-floor storage/garage into 2 bedrooms 3-fixture bath, a kitchenette, utility room and laundry. 2) relocate and replace w/h. 3) relocate furnace.
Add sill plate anchor bolts and plywood to cripple walls (if existing) per LA City Standard Plan #1; no foundation replacement (Earthquake hazard reduction per Chapter 92 of the Lo…
Add sill plate anchor bolts and plywood to cripple walls (if existing) per LA City Standard Plan #1; no foundation replacement (Earthquake hazard reduction per Chapter 92 of the Lo…