Search Building Permits
2,079 permits · HVAC · TX
Replacement of complete existing central heat and air system with or without duct work
ePlan: Expedited Review - First Time Finish Out for Units.
Rework existing mechanical units on level 2. Add additional louver to the area to server 3 new intake fans. Work is in exterior room no Asbestos. Work is in non occupied mechanical room no TAS.
ePlan: Expedited Review - First Time Finish Out for 2nd Floor - contains Units Leasing Office Fitness/Locker Rooms Co-Workings Pool Equipment Room and 123 S 1ST Restaurant Shell Continued from Level 1...
Replacement of complete existing central heat and air system with or without duct work Michelle Aguilar
ePlan: Expedited Review - First Time Finish Out for Units.
7 DAY - No architectural work in scope. Mech and Elec related work only of an existing demised tenant suite. Suite occupancy classificationand use group remains unchanged by the MEP Scope refer to MEP...
Replacement of complete existing central heat and air system with or without duct work 2 - 2.5 ton gas systems ductwork
install mini split in backyard pod addition
ePlan: Expedited Review - First Time Finish Out for Units.
Replacement of complete existing central heat and air system with or without duct work HVAC change out
ePlan: Expedited Review - New Construction of a Parking Garage for Mixed Use Multi-Family Bldg.
ePlan: Expedited Review - First Time Finish Out - Contains condo Lobby Office and Mail.
New 1-story single family residence 3 bed/2 bath with attached garage covered porch and patio Green building
Interior Remodel- New master suite new bathroom and closet reconfiguring closets laundry room kitchen walls. Remove concrete walkway in front and add new steps and walkway to porch (no new additional...
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
ePlan: Residential Expedited Review - New detached accessory studio (non-dwelling unit) for single family use 1 bathroom.
Replacement of complete existing central heat and air system with or without duct work Replace 5 ton gas system. Horizontal in attic above laundry room. Gold Multi Stage - Need to run new thermostat w...
ePlan: Expedited Review - First Time Finish Out for Units.